Crane Safety in Construction Sites

2013· article· en· 3 citations· W2160289646 sur OpenAlex· 10.7492/ijaec.2013.009

Pourquoi ce travail est-il dans la base ?

Une base qui oublie comment elle a trouvé un travail ne peut pas être vérifiée. Voici les voies qui ont admis celui-ci.

Revue canadienneIl a paru dans une revue canadienne.

Aucune affiliation canadienne. Une base fondée sur la seule affiliation (le devis habituel) n'aurait jamais vu ce travail. C'est l'un des travaux qui justifient l'inversion de la base.

Le tri à trois modèles

les 1 000 travaux triés →

Les trois modèles l'ont jugé hors champ.

strate : venue_new · poids de sondage : 2684.25 (l'échantillon est stratifié ; tout taux calculé sans le poids est faux)
Claude Opus 4.8OUT
genre : empirical
porte sur le Canada: non
confiance: high

Develops an AHP/fuzzy-logic crane safety index for construction sites; the object is site safety, not research.

GPT-5.6 (high)OUT
genre : empirical
porte sur le Canada: non
confiance: high

The study develops a construction-crane safety index and does not study research practice.

Grok 4.5OUT
genre : empirical
porte sur le Canada: non
confiance: high

Construction-site crane safety index using AHP and fuzzy logic; occupational safety domain.

Résumé

Many types and sizes of cranes are used to lift and move heavy materials in construction sites. The technology used in cranes has improved dramatically in the past decades in a way that this technology has, in many ways, outstripped the ability of people to use the machines safely. This misusage makes crane's accidents one of the more severe and highly visible construction accidents. Heavy reliance must be placed on the factors aecting crane safety that may dier with its impact and severity from one project to another. The presented research in this paper establishes a methodology for assessing and evaluating crane safety in construction site by introducing a crane safety index (CSI) model using two dierent decision-making methodologies: Analytic Hierarchy process (AHP) and Fuzzy Logic. The goal of the developed model is to help planners improve crane operation and meet safety requirements. In order to achieve this goal, a survey was conducted aiming at assessing the factors that aect crane operation. The CSI was designed and applied to the collected data to obtain a safety index value. The presented research is vital for planners (contractors) because it gives them a fast, accurate, and advanced tool for obtaining a CSI. The index indicates the performance of crane safety operation in construction sites, allowing for a chance to spot and encompass the factors causing hazardous circumstances, and the possibility to enhance the crane safety plan.

Conservé avec la notice de tri, où il sert de preuve aux étiquettes ci-dessus.

La notice

Revue
International Journal of Architecture Engineering and Construction
Thématique
Risk and Safety Analysis
Domaine
Decision Sciences
Établissements canadiens
Organismes subventionnaires
Mots-clés
Construction engineeringBusinessEngineering
Résumé présent dans OpenAlex
oui