MétaCan
Menu
Retour à la cohorte
Enregistrement W2227132767

Simulation Based Modeling of Inventory Policies and Operating Procedures in Complex, Low-Volume Electronics Manufacturing

2011· article· en· W2227132767 sur OpenAlexvenueaboutno aff
Eric Giacomin

Notice bibliographique

RevueLibrary and Archives Canada (Government of Canada) · 2011
Typearticle
Langueen
DomaineEngineering
ThématiqueScheduling and Optimization Algorithms
Établissements canadiensnon disponible
Organismes subventionnairesnon disponible
Mots-clésElectronicsVolume (thermodynamics)Computer scienceManufacturing engineeringIndustrial engineeringEngineeringElectrical engineering
DOInon disponible

Résumé

récupéré en direct d'OpenAlex

This simulation study considers a low-volume manufacturing system, which produces complex, customized electronics. Modeling demand as a renewal-reward process, the simulation, inspired by the production system and available data from a Canadian company, examine the performance of alternative inventory policies and operating procedures. Performance indicators that measure the responsiveness and inventory on hand show trade-offs between them in order to supply relevant information to decision makers. Experiments compare make-to-order and make-to-stock scenarios with various inventory parameters as well as introducing variability to examine the model’s robustness under uncertainty. \n\nThe system under consideration consists of three main processes to manufacture a finished product from raw materials. The first process fabricates metal and electrical components from raw materials. Second, a worker assembles components into a semi-finished product. The third requires information from the customer in order to customize the product according to their needs, and test the unit to ensure its quality. The company, known for their well-designed products and exceptional customer service, wants to improve the accuracy of their leadtime promising. The current MRP control system assumes a completely make-to-order environment where every piece of WIP has a customer order attached to it. However, a forecast of orders likely to materialize from the sales quotes allows production to initiate jobs before the actual order arrives.\n\nThe approach taken to analyzing this system involves studying the make-to-stock, make-to-order decision at two stock points, components and semi-finished units. The operating procedures examine four possible stocking strategies: holding no inventory, holding only component or semi-finished inventory, and holding both components and semi-finished units. Simulation experiments determine the trade-off between holding inventory and the responsiveness to the customer for each operating procedure. Sources of randomness introduced to processing time, capacity, and demand, show how they respond to added variability. \n\nThe simulation experiments indicate that holding no inventory, and waiting for a customer order to initiate jobs, results in unstable performance. In order to achieve a stable make-to-order system, it would be necessary to have a fifty percent reduction in demand or product cycle time, a capacity expansion, or forecasting method. In the absence of an accurate forecast model, holding inventory is necessary for an acceptable level of performance. Component inventory is useful as many components are common among a number of products. Suitable component inventory can lead to customer orders typically fulfilled within two weeks. Adding semi-finished inventory can reduce the customer lead-time to under a week though requires stocking at least a few of each semi-finished unit. Holding semi-finished inventory without component stock is possible. However, it is necessary that the replenishment quantity be three or more units ordered at a time. Otherwise, the setup time for components exceeds the allowable limits and resource queues become unstable, much like the completely make-to-order scenario. Using an order-up-to parameter for semi-finished stock can further decrease the setup time incurred per unit. \n\nThe model is robust to randomness in job times, though it is component stock, which provides an effective buffer to this variability. Machine breakdowns begin to affect responsiveness measures if the average time for repair is greater than a week. Reducing the capacity in the assembly and testing processes can provide the same level of service indicating the two resources are underutilized. The analysis of this system shows the current make-to-order model requires some forecast to function in steady state, which is difficult to model without information on the current forecasting processes. Expanding the simulation model to incorporate forecasting or some other means of analysis can improve its accuracy and credibility as a management decision tool.

Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.

Comment cette classification a été obtenuedéplier

Prédiction distillée sur la base complète

Imitation des enseignants

Ni prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.

score de la tête « metaresearch » (Codex)0,000
score de la tête « metaresearch » (Gemma)0,000
Version: codex-gemma-dda1882f352aStatut de validation: machine_predicted_unvalidated
Catégories candidatesaucune
Catégories consensuellesaucune
DomaineSignal candidat: aucune · Signal consensuel: aucune
Devis d'étudeSignal candidat: Simulation ou modélisation · Signal consensuel: Simulation ou modélisation
GenreSignal candidat: Empirique · Signal consensuel: Empirique
Score de désaccord entre enseignants0,027
Score d'incertitude au seuil0,402

Scores Codex et Gemma par catégorie

CatégorieCodexGemma
Métarecherche0,0000,000
Méta-épidémiologie (sens strict)0,0000,000
Méta-épidémiologie (sens large)0,0000,000
Bibliométrie0,0000,000
Études des sciences et des technologies0,0000,000
Communication savante0,0000,000
Science ouverte0,0000,000
Intégrité de la recherche0,0000,000
Charge utile insuffisante (le modèle a refusé de juger)0,0000,000

Scores machine (provisoires)

Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.

Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.

Tête enseignante Opus0,008
Tête enseignante GPT0,157
Écart entre enseignants0,149 · la distance entre les deux têtes enseignantes sur ce seul travail
Statut de validationscore_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle

Classification

machine, non validée

Prédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.

Les modèles n’ont appliqué aucune catégorie : rien dans la taxonomie ne correspondait à ce travail.
Devis d'étudeSimulation ou modélisation
Domainenon disponible
GenreEmpirique

Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».

En bref

Citations0
Publié2011
Routes d'admission2
Résumé présentoui

Explorer davantage

Même revueLibrary and Archives Canada (Government of Canada)Même sujetScheduling and Optimization AlgorithmsTravaux en français237 207