Creation of an Evolutive Conceptual Know-how Framework for Integrative Building Design

2011· article· en· W2243253930 sur OpenAlexaffabout
Ivanka Iordanova, Chiocchio François Forgues Daniel

Notice bibliographique

Revuenon disponible
Typearticle
Langueen
DomaineEngineering
ThématiqueBIM and Construction Integration
Établissements canadiensUniversité de Montréal
Organismes subventionnairesnon disponible
Mots-clésMultidisciplinary approachBuilding information modelingProcess managementKnowledge managementProductivityProcess (computing)Conceptual frameworkBuilding designSustainable designComputer scienceEngineeringEngineering managementArchitectural engineeringSustainabilityOperations managementSociology
DOInon disponible

Résumé

récupéré en direct d'OpenAlex

Low productivity of the building sector today is attributed to the fragmentation of tasks, disciplines and responsibilities, as well as to the resistance to adopt integrative work processes and digital means. The increased complexity of architectural projects and the aroused social consciousness for sustainable environment calls for integrative design collaboration. Thus, there is need for a Conceptual Framework combining work processes, technological means and policy aspects. According to the literature, integrative multidisciplinary design is a strategy resulting in high performance buildings nurturing sustainable way of living (Reed et al. 2009, Krygiel & Nies 2008). Responding to the increased technological complexity of our built environment, as well as to the objective of meeting multiple criteria of quality, both necessitating multidisciplinary collaboration during design, Building Information Modeling (BIM) is seen as a powerful means for fostering quality, augmenting productivity and decreasing loss in construction. Based on recent research, we can propose that a sustainable building can be designed through an integrative design process (IDP) which is best supported by BIM. However, our ongoing research program and consultations with advanced practitioners underscore a number of limitations. For example, a large portion of the interviewed professionals and construction stakeholders do not necessarily see a link between sustainable building, integrative design process and BIM, while in our opinion, their joint use augments the power of each of these approaches taken separately. Thus, there is an urgent necessity for the definition of an IDP-BIM framework, which could guide the building industry to sustainable results and better productivity. This paper defines such a framework, whose theoretical background lays on studies in social learning (activity theory and situated action theories). These theories suggest that learning and knowledge generation occurs mainly within a social process defined as an activity. This corresponds to the context in which the IDP-BIM framework will be used, its final objective being the transformation of building design practices. The proposed IDP-BIM framework is based on previous research and developments. Thus, firstly, IDP process was well formalized in the Roadmap for the Integrated Design Process (Reed et al.) which is widely used as a guideline for collaborative integrative design by innovating practices in USA and Canada. Secondly, the National Building Information Modeling Standard (NBIMS) of the USA is putting an enormous effort in creating a BIM standard, Succar (2008) recently proposed a conceptual framework for BIM, but BIM ontology is still under development (Gursel et al 2009). Thirdly, an iterative design process bound to gating reviews (inspired from software development processes) was found to be successful in the context of multidisciplinary design studios (reported in our previous papers). The feedback from this study allowed for modifications and adjustments included in the present proposal. The gating process assures the good quality of the project and its compliance to the client's requirements. The challenge of this research is to map the above mentioned approaches, processes and technologies into the design process, thus creating an integrated framework supporting and nurturing sustainable design. The IDP-BIM framework can be represented by a multidimensional matrix linked to a semantic network knowledge database: - the axes of the matrix being the project timeline, the design process actors and building stakeholders (architect, engineers, client, contractor, environmental biologist, etc.), or different aspects of building performance (environmental, functional, social, interior environment quality, cost, etc.), and - the knowledge database providing multiple layers of semantic support in terms of process, domain knowledge, technology and workflow at a given moment of the project and for a given actor or building aspect. The IDP-BIM framework is created as an evolutive digital environment for know-how and will have an established protocol for regular updates. The paper will firstly present the state of the art in IDP and BIM. Secondly, it will expose the methodology used for the definition of the Framework, followed by a description of its structure, contents and digital implementation. Then, some scenarios for the use of the Framework will be shown as validation.

Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.

Comment cette classification a été obtenuedéplier

Prédiction machine sur la base complète

Imitation des enseignants

Ni prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.

score de la tête « metaresearch » (Codex)0,012
score de la tête « metaresearch » (Gemma)0,007
Version: metacan-v3-hybrid-931329e0061cStatut de validation: machine_predicted_unvalidated
Catégories candidatesaucune
Catégories consensuellesaucune
DomaineSignal candidat: aucune · Signal consensuel: aucune
Devis d'étudeSignal candidat: Théorique ou conceptuel · Signal consensuel: Théorique ou conceptuel
GenreSignal candidat: Méthodes · Signal consensuel: Méthodes
Score de désaccord entre enseignants0,012
Score d'incertitude au seuil0,062

Scores du classifieur distillé par catégorie (deux têtes)

CatégorieCodexGemma
Métarecherche0,0120,007
Méta-épidémiologie (sens strict)0,0010,001
Méta-épidémiologie (sens large)0,0010,003
Bibliométrie0,0060,004
Études des sciences et des technologies0,0040,016
Communication savante0,0120,015
Science ouverte0,0060,009
Intégrité de la recherche0,0050,006
Charge utile insuffisante (le modèle a refusé de juger)0,0050,001

Scores machine (provisoires)

Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.

Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.

Tête enseignante Opus0,034
Tête enseignante GPT0,254
Écart entre enseignants0,221 · la distance entre les deux têtes enseignantes sur ce seul travail
Statut de validationscore_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle

Classification

machine, non validée

Prédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.

Les modèles n’ont appliqué aucune catégorie : rien dans la taxonomie ne correspondait à ce travail.
Devis d'étudeThéorique ou conceptuel
Domainenon disponible
GenreMéthodes

Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».

En bref

Citations1
Publié2011
Routes d'admission2
Résumé présentoui

Explorer davantage

Même sujetBIM and Construction IntegrationTravaux en français237 207