New developments on mine planning and grade control at Sishen Iron Ore Mine
Notice bibliographique
Résumé
Sishen Iron Ore Mine is situated 280 km north-west of Kimberley in the Northern Cape Province of South Africa. The mine produces and sells high quality iron ore of various specifications to various national and international clients. The saleable product is derived from the blending and beneficiation of different types and qualities of hematite iron ore. This paper documents the new developments which were implemented (or are in the process of being implemented) on the mine in the long-term planning, medium-term planning, grade control and material tracking in the beneficiation plant with special attention being paid to the quality of the final, saleable product. The process starts with the long-term planning where the pit shell and pit optimization is determined by Whittle 4X. New developments include the introduction of a linear programming based scheduling system to enhance the long-term schedule generated by Whittle 4X. The LP route was decided on in order to take into account all the constraining factors of the final product that could not be configured in Whittle. To complement this the XPAC Auto Scheduler scheduling package was introduced to do the medium-term mine scheduling. This 18- month rolling plan includes cost parameters to enable the planner to extract a detailed operational budget from the scheduling while ensuring that production standards are maintained and grade constraints are met. The existing grade control system was enhanced with GPS capabilities and a computer system to do material tracking. The high precision GPS system introduced on the shovels allows for the accurate control of the loading procedures at the mining face. Because of the complicated geology and grade composition of blasting blocks it is imperative to accurately differentiate between different materials in the same blasting block and being able to excavate that with the loading equipment. The GPS system on the trucks allows for accurate location monitoring of dumping in order to keep track of specific material types. The state-of-the-art material tracking system developed for Sishen will enable the grade control officer to keep track and record various parameters of the material from its in situ position in the blasting blocks, through the crusher and onto different stockpiles, in various stages of the beneficiation process and onto the blending beds, into the dispatching trains and eventually into the ships for international distribution. These developments elevate the Sishen planning and grade control systems to a new level of service excellence from which management can obtain accurate and timely information on product status. It also enables Sishen to maximize resource utilization while still complying with the tough market constraints.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».