Using monte carlo simulation to mitigate the risk of project cost overruns
Notice bibliographique
Résumé
Cost overruns are common on government and commercial projects. This paper proposes a cost risk estimating method that provides more accurate estimates of total project cost and answers the following important questions: (1) What is the most likely cost? (2) How likely is the baseline cost estimate to be overrun? (3) How much contingency is required on the project to guarantee that the total project cost is not to be exceeded, with a certain confidence level? The proposed method is based on the Monte Carlo simulation. It helps gain better information than traditional cost estimating methods, mainly because it recognizes that project costs are uncertain. A fictitious case study was developed to provide a structured way to provide the contingency value of a project in order to avoid cost overruns. Data were collected on low, most likely and high possible costs and the @Risk software from the Palisade Corporation was used to run the Monte Carlo simulations. Using a simplified cost case study, this paper demonstrates how Monte Carlo simulation can assist project managers in estimating the contingency to be allocated to their project, and contribute to fostering and bolstering the credibility of risk analysis results.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,001 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».