Developing a cost normalization framework for phase-based performance assessment of construction projects
Notice bibliographique
Résumé
Capital project benchmarking requires an effective cost normalization process to achieve reasonable comparisons of cost-related performance for projects that are executed at different times and locations. Traditionally, cost normalization approaches were developed for ex post facto analysis of project performance and assume that all required information is fully available from a completed project. However, practitioners have expressed the need for cost normalization techniques to evaluate phase-level outcomes during ongoing projects. This paper aims to provide a cost normalization framework tailored to phase-based performance assessment. The framework involves three main steps: currency conversion, location adjustment, and time adjustment with considerations for various scenarios where the required information is not fully available. Case studies are conducted to demonstrate how the proposed cost normalization framework has been applied to phase-based performance assessment for capital projects. The proposed framework can benefit both researchers and industrial professionals interested in cost estimation, feasibility analysis, and performance assessment.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction machine sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.
Scores du classifieur distillé par catégorie (deux têtes)
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,018 | 0,027 |
| Méta-épidémiologie (sens strict) | 0,002 | 0,001 |
| Méta-épidémiologie (sens large) | 0,002 | 0,002 |
| Bibliométrie | 0,008 | 0,006 |
| Études des sciences et des technologies | 0,001 | 0,002 |
| Communication savante | 0,005 | 0,006 |
| Science ouverte | 0,004 | 0,004 |
| Intégrité de la recherche | 0,002 | 0,003 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,003 | 0,001 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».