Abstract Vertical Steam Flood Heavy Oil developments, such as Shell's Carmon Creek project, require a large number of wells. This high well count leads to the wells contributing a large part of the project cost and a large physical footprint. In the Carmon Creek project, the challenge for Shell was to safely drill and complete thousands of wells at the lowest possible cost while minimizing the footprint. The approach taken was that of a ‘Wells Manufacturing System’, using new technology, bespoke equipment and novel ways of working. The well construction operations were broken down in repeatable steps. This enabled fast learning and it provided the basis to engineer out ‘flat-time’ activities by designing fit-for-purpose equipment, such as BOP systems, wellheads and drilling rigs. Partnerships in low cost manufacturing locations were formed to build this equipment. A multi-disciplinary team designed wellpads, not only making them as small as possible, but also to enable the implementation of an assembly line philosophy. Three-dimensional well planning was crucial to establish the optimal well spacing at reservoir level. Drilling performance in similar developments was benchmarked extensively to be able to set challenging targets and to be able to measure performance. Given the application of the wells manufacturing system, using the same well design for both injector and producer wells was deemed most cost effective, since the key to the success of the manufacturing philosophy is repetition. This saves time and optimizes the supply chain. The resulting wellpad design has an unprecedented well count per pad of up to 49 wells, positioned in a single line. The well spacing was driven by how close beam pumps can physically be placed. The fit-for-purpose rigs have substructures that cover three wells simultaneously and function in essence as self-walking assembly halls, furnished with a super-single drilling mast. The rigs are equipped with double BOP's that can leapfrog. Work on three wells is performed simultaneously and activities such as BOP testing and waiting-on-cement are taken off the critical path. The rigs were built and operated by a Shell Joint Venture, blurring the boundaries between the traditional roles of operator, drilling contractor and Service Company, based on three principles: Build a Long-term relationship that allows Continuous Performance ImprovementTechnology that results in fit-for-purpose (FFP) equipmentVery attractive pricing that is not coupled to North American market volatility Drilling commenced in 2014 and performance has been excellent, particularly with learning by repetition exceeding expectations. The Project itself was cancelled due to political and economic reasons, but drilling on two pads was completed prior to the project halt. In total, 92 wells were drilled, with 65 wells achieving ‘Best in Class’ time and cost performance, and 77 Top Quartile wells. Well times and costs as a result decreased by up to 50%.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».