The North American construction industry has experienced periods of craft shortages for decades. While this problem has received significant attention from researchers, less attention has been given to quantifying the impact of availability of craft labour on project performance. The primary contribution of the current work to the body of knowledge is the quantification of the relationship between craft labour availability and project performance, as measured by project productivity and schedule. Data from 97 construction projects completed in the U.S. and Canada between 2001 and 2014 were collected from two industry databases. The primary analysis shows that projects that experienced craft shortages underwent substantial and statistically lower productivity compared to projects that did not. The analysis also shows a significant growth in schedule overrun due to the craft labour shortages among the same population of projects. Further exploration by means of several regression analyses shows a statistically significant correlation between increased craft recruiting difficulty and lower project productivity and also higher schedule overruns in both project databases. The results are confirmed across both databases and serve as informative models that provide valuable insight for project management teams to perceive the risk that lack of skills poses on project productivity and time performance. Understanding the level of impact that craft shortages are having through robust statistical analyses is a first step in developing the motivation for industry leaders, communities and construction stakeholders to address this challenge.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction machine sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.
Scores du classifieur distillé par catégorie (deux têtes)
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,004 | 0,014 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,002 | 0,004 |
| Études des sciences et des technologies | 0,001 | 0,000 |
| Communication savante | 0,001 | 0,001 |
| Science ouverte | 0,001 | 0,001 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,001 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».