Disruption Risk Management in Serial Multi-Echelon Supply Chains
Notice bibliographique
Résumé
This research focuses on managing supply chain disruption risk using inventory and reserve capacity in serial multi-echelon supply chains. The research problem is to determine the optimal risk mitigation inventories and reserve capacities when product transformation occurs at each echelon. Disruptions at each echelon are modeled as a random process. We derive insights on the optimal location and quantity of risk mitigation inventory (RMI) and reserve capacity held in serial supply chains. We show that the downstream echelon typically holds at least as much RMI as the upstream echelon. At the same time, it is often optimal to hold additionally more reserve capacity downstream than upstream. These results hold under the assumption that inventory and reserve capacity holding costs are larger downstream than upstream. Our research also suggests that RMI is preferred to reserve capacity as a risk mitigation lever in long serial supply chains, i.e., in supply chains with a large number of echelons. This research problem is inspired by a risk management problem of a leading pharmaceutical company.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,004 | 0,002 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,003 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».