A Systems Approach for the Evaluation and Rebuilding of the Rogers Pass Systems on Canadian Pacific
Notice bibliographique
Résumé
Abstract In the 1980’s, Canadian Pacific (CP) constructed one of the most ambitious projects since the original completion of the railway in 1885. The Rogers Pass project was initiated at CP in the early 1980’s to allow for increased capacity and efficiency by installing a second main track within the Rogers Pass area. Completed in 1988, the Rogers Pass Project included the construction of a new line with significantly lower westbound grades and two tunnels with a combined length of over ten miles. Several other systems were required to complete the project that will be discussed I this paper. Recently, CP has started a new Multi-Year Plan to rebuild virtually all of the tunnel systems infrastructure that will not only prolong the life of these systems, but will introduce technology not known at the time of construction. These new systems will enable CP to greatly reduce maintenance cost while improving reliability. These systems include a high voltage transmission line that feed the ventilation house, a sophisticated ventilation system that allows fresh combustion air to reach the locomotives working the uphill grades, as well as process controllers that automate all of these systems. As all of the systems are reaching the end of their useful life, CP’s rebuilding will also increase overall system capacity.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».