Comparing Mixed-Integer Programming and Constraint Programming Models for the Hybrid Flow Shop Scheduling Problem with Dedicated Machines
Notice bibliographique
Résumé
The paper considers a two-stage hybrid flow shop scheduling problem with dedicated machines and release dates. Each job must be first processed on the single machine of stage 1, and then, the job is processed on one of the two dedicated machines of stage 2, depending on its type. Moreover, the jobs are available for processing at their respective release dates. Our goal is to obtain a schedule that minimizes the makespan. This problem is strongly NP-hard. In this paper, two mathematical models are developed for the problem: a mixed-integer programming model and a constraint programming model. The performance of these two models is compared on different problem configurations. And the results show that the constraint programming outperforms the mixed-integer programming in finding optimal solutions for large problem sizes (450 jobs) with very reasonable computing times.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction machine sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.
Scores du classifieur distillé par catégorie (deux têtes)
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,004 | 0,009 |
| Méta-épidémiologie (sens strict) | 0,002 | 0,001 |
| Méta-épidémiologie (sens large) | 0,001 | 0,002 |
| Bibliométrie | 0,001 | 0,002 |
| Études des sciences et des technologies | 0,001 | 0,001 |
| Communication savante | 0,003 | 0,003 |
| Science ouverte | 0,002 | 0,001 |
| Intégrité de la recherche | 0,002 | 0,002 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,003 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».