BIM-enabled Modular and Industrialized Construction in China
Notice bibliographique
Résumé
The Chinese construction market is huge in terms of its size but facing many issues not matching its high speed development, such as low field productivity, unreliable quality, high resource and energy consumption, often safety accidents, and significant environment pollution. Those issues are mainly associated with the old fashion of construction method. The concept of industrialization of construction has been recognized since the establishment of the People’s Republic of China, but did not get well developed until recently the industry is under the pressure of increasing labour cost and the demand of sustainable development. There was a surge of Building Information Modeling (BIM) application in last few years in China and the industry has seen lots of benefits of virtual design and construction. Integrating BIM technology into industrialization of construction is seen as a promising opportunity to improve the performance of modular and industrialized construction. This paper first reviews the history of industrialization of the Chinese construction industry and then discusses the recent BIM adoption in China. The approaches of using BIM to enable modular design and industrialized construction and installation in China are the main focus of this paper.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction machine sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.
Scores du classifieur distillé par catégorie (deux têtes)
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,001 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,002 | 0,004 |
| Études des sciences et des technologies | 0,001 | 0,001 |
| Communication savante | 0,001 | 0,001 |
| Science ouverte | 0,001 | 0,002 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,003 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».