Recent Experiences: Building Waste Management Facilities in Remote Areas
Notice bibliographique
Résumé
Recent Experiences: Building Waste Management Facilities in Remote Areas Evan Sedlock; Evan Sedlock ChevronTexaco Search for other works by this author on: This Site Google Scholar Rob Hoffmann; Rob Hoffmann ChevronTexaco Search for other works by this author on: This Site Google Scholar Jimoh Ainodion; Jimoh Ainodion ChevronTexaco Search for other works by this author on: This Site Google Scholar Steve Pegors; Steve Pegors ChevronTexaco Search for other works by this author on: This Site Google Scholar Fidel Gonzalez Fidel Gonzalez ChevronTexaco Search for other works by this author on: This Site Google Scholar Paper presented at the SPE International Conference on Health, Safety, and Environment in Oil and Gas Exploration and Production, Calgary, Alberta, Canada, March 2004. Paper Number: SPE-86660-MS https://doi.org/10.2118/86660-MS Published: March 29 2004 Connected Content Related to: Waste-Management Facilities in Remote Areas Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Sedlock, Evan, Hoffmann, Rob, Ainodion, Jimoh, Pegors, Steve, and Fidel Gonzalez. "Recent Experiences: Building Waste Management Facilities in Remote Areas." Paper presented at the SPE International Conference on Health, Safety, and Environment in Oil and Gas Exploration and Production, Calgary, Alberta, Canada, March 2004. doi: https://doi.org/10.2118/86660-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE International Conference and Exhibition on Health, Safety, Environment, and Sustainability Search Advanced Search AbstractMany exploration and production (E&P) operations are located in developing countries or remote locations that often have poor infrastructure. Commercial waste management facilities of adequate quality may be nonexistent or prohibitively distant, and production expansions are filling the capacity of existing facilities at the E&P sites. ChevronTexaco's business philosophy includes continually improving processes to minimize pollution and waste. As part of our ongoing efforts to improve E&P waste management efforts, we are identifying cost-effective and environmentally protective alternatives for waste management including building new on-site facilities and equipment, evaluating available off-site options, and developing local businesses and infrastructure. We then optimize the selection of alternatives for each location using an overall waste review process.This paper will highlight recent and planned investments in our international waste management facilities including:In Venezuela in 2002, the company commissioned a U.S. $1.8 million state-of-the-art facility that is designed to handle a broad spectrum of wastes from the Boscan oil field.In Sumatra, Indonesia, a subsidiary of ChevronTexaco has reviewed its waste management strategies and developed comprehensive plans for additional waste management facilities and stand-alone equipment totaling U.S. $6.0 million that is awaiting governmental approval. This is in addition to several recently commissioned major facilities for improved management of oily wastes including a slurry injection facility and five soil bioremediation facilities.In Nigeria, plans are underway for a variety of new waste management facilities totaling U.S. $28 million including a landfill, incinerators, slurry injection, and a sewage treatment plant.In Kazakhstan, the company's joint venture Tengizchevroil has initiated design and construction of a U.S. $16 million integrated waste management facility. The facility will include a landfill, a recycling and treatment area, and a reception facility with a weighbridge. In 2004, the landfill and key site infrastructure elements will be commissioned.IntroductionExploration and production facilities generate a wide variety of wastes including drilling muds and cuttings, oily solids from tank cleanouts, construction and demolition debris, municipal waste and sewage from on-site personnel, etc. Dealing with this wide variety of materials is problematic for operations in remote locations. Often commercial treatment and disposal facilities are not available, infrastructure is poor, transportation and logistics are difficult, and the wide variety of waste streams may require multiple management techniques and equipment. This often necessitates an overall review of waste management needs, an integrated management plan, and construction of recycling, treatment, and disposal facilities.Waste Management Planning and Review ProcessGeneral guidelines on waste management methods, waste minimization, and waste management planning for E&P operations is available from the International Association of Oil and Gas Producers (OGP)1 and The American Petroleum Institute (API)2. In addition, ChevronTexaco developed and uses an overall waste management review and planning process to select alternatives for major facility planning efforts. This process includes a comprehensive review of anticipated wastes from current and future operations, incorporation of local regulatory requirements, identification of appropriate waste management options, development of selection criteria, and choosing the optimum combination of management methods and facilities. Emphasis is placed on applying the waste minimization hierarchy and maximizing recycle and reuse opportunities. Discussion of this planning process for our Indonesia operations has been published in previous SPE papers.3,4 ChevronTexaco's capital project management process also includes specific tools and activities that integrate pollution prevention and waste minimization concepts into the designs for our projects with the goal of generating fewer wastes with reduced hazards. Keywords: waste management facility, spe 86660, soil bioremediation facility, upstream oil & gas, building waste management facility, construction, waste management, exploration, management facility, operation Subjects: Environment, Waste management This content is only available via PDF. 2004. Society of Petroleum Engineers You can access this article if you purchase or spend a download.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».