Near-Field Exploration: From Failure to Success
Notice bibliographique
Résumé
Near-Field Exploration: From Failure to Success Tim Marchant; Tim Marchant BP Search for other works by this author on: This Site Google Scholar Hamish Wilson; Hamish Wilson Paras Consulting Search for other works by this author on: This Site Google Scholar David Bamford David Bamford BP Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, September 2001. Paper Number: SPE-71428-MS https://doi.org/10.2118/71428-MS Published: September 30 2001 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Marchant, Tim, Wilson, Hamish, and David Bamford. "Near-Field Exploration: From Failure to Success." Paper presented at the SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, September 2001. doi: https://doi.org/10.2118/71428-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Annual Technical Conference and Exhibition Search Advanced Search AbstractDuring the late 1980's and early-mid 1990's both BP and Amoco invested large sums of money exploring close to their core producing fields in traditional 'heartlands' such as the North Sea, Alaska and L48. These investments were largely unsuccessful. Amoco coined the term 'stealth exploration' to describe the activity carried out by individual assets whose failure costs only later appeared on the corporate balance sheet as exploration write-off.The recent industry focus on short-term production has reawakened interest in near-field exploration. BP is no exception. Despite the overall corporate perception of failure, it became apparent that some business units, notably Canada Gas and Egypt Oil, were making a quiet success of near-field exploration. Therefore the company conducted a study to understand what made these BU's successful. The lessons learned were:A focus on monetisation and cycle timeTight integration between exploration and productionTight control of subsurface technical riskFocus on certain key playsThe company allocated a limited amount of seed capital to test the concept of near-field exploration in five business units where BP has a dominant ownership of the regional infrastructure. This diverse group of upstream businesses has successfully managed a limited exploration programme and demonstrated that near-field exploration can be controlled and can add value through short-term production.The key conclusion to be drawn from this story of 'corporate learning' is that near-field exploration in large companies can make money provided three actions are taken:Do not compromise on subsurface technical risk in the face of pressure from engineers and others attracted by the economics - an investment with a positive EMV and/or high RoR with a high technical risk is still a high-risk investment.Manage the activity as an integrated part of the production asset to minimise cycle time.Set tight performance metrics and manage the portfolio globally.IntroductionThis paper describes how BP's successful value driven, near-field exploration programme was designed and set up. The case study shows how the company built on the lessons learned from the historical failure of this type of activity in the three companies that now make up BP. A best practice near-field exploration process was designed which emphasised both capital allocation and cycle time. The process was implemented and the early indications are that it is successful.Exploration is proving to be a lever that materially contributes production rate and therefore is becoming one of the key contributors to short term production growth. This requires the exploration business units to add to production yet stay within BP's traditional tight management of exploration spend and write off - the challenge is to deliver while not allowing a degradation of performance through doing too much. Measures to maintain and improve performance include - collective ownership of portfolio outcomes, tight performance metrics and continued restriction on budget.Within three years the company has moved from a position where risk and size were the key metrics for the exploration portfolio to one in which a significant portion of the budget is now allocated on the basis of value and short term production rate. This change required a shift in the mindset of the exploration community to take part ownership of the production and value that is generated from exploration activity and not just discovered volumes. Keywords: wilson, marchant, exploration, david bamford, cycle time, programme, exploration management, society of petroleum engineers, prediction accuracy, para consulting Subjects: Asset and Portfolio Management This content is only available via PDF. 2001. Society of Petroleum Engineers You can access this article if you purchase or spend a download.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,001 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».