Selection, Operation, and Evaluation of High Temperature Oil in Water Monitor for Two-Phase Extra Heavy Oil (Bitumen) Test Separator Service at Peace River
Notice bibliographique
Résumé
Selection, Operation, and Evaluation of High Temperature Oil in Water Monitor for Two-Phase Extra Heavy Oil (Bitumen) Test Separator Service at Peace River Micheal D. Geneau Micheal D. Geneau Shell Canada Limited Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Western Regional/AAPG Pacific Section Joint Meeting, Long Beach, California, May 2003. Paper Number: SPE-83505-MS https://doi.org/10.2118/83505-MS Published: May 19 2003 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Geneau, Micheal D. "Selection, Operation, and Evaluation of High Temperature Oil in Water Monitor for Two-Phase Extra Heavy Oil (Bitumen) Test Separator Service at Peace River." Paper presented at the SPE Western Regional/AAPG Pacific Section Joint Meeting, Long Beach, California, May 2003. doi: https://doi.org/10.2118/83505-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Western Regional Meeting Search Advanced Search AbstractSince 1986, Shell Canada has been using two-phase separators for well test application in bitumen production service. As bitumen (8 to 10 API) at Peace River has a density similar to that of produced water, depending on operating temperature, the use of three-phase test separators is not practical. In bitumen service, a three-phase separator requires either heating or cooling plus diluent to reduce the bitumen density so that classical gravity separation can be achieved.With a two-phase system, a means is required to determine the amount of oil in the produced emulsion. This is often achieved by either obtaining a representative fluid sample from the separator and determining the water cut in the lab, or by an online instrument. The two-phase well test system operates at temperatures ranging from 80 to 200 °C at an operating pressure of 1500 kPa. The water cuts from the wells range from 10 to 90 percent with an average of 40 percent. Agar's OW-201 water-cut monitors, in conjunction with Coriolis mass flow meters, were selected for test separator systems at Peace River.This paper describes the field tests performed to verify the Agar OW-201 meter operation for Peace River service, Shell's operating experience to date and the performance achieved during one year of operation.IntroductionThe Peace River development, shown in Figure 1, is located in northern Alberta, Canada, approximately 450 km north of Edmonton. The Peace River bitumen deposit lies 600 m true vertical depth (TVD) and covers approximately 37,000 hectares (142 sq mi). Total bitumen in place is estimated at one billion cubic meters.The bitumen is an extra heavy deposit having density of 1018 kg/ m3 whilst the connate water has a density of 1006 kg/ m3. Insitu, the bitumen has a viscosity approaching 100,000 cp at a reservoir pressure of 3600 kPa. The bitumen is essentially immobile insitu and steam is used to heat the bitumen and reduce the viscosity such that it can flow to the wellbores. The density of the bitumen and the water changes at different rates resulting in the water and the bitumen having quite similar densities at temperatures from 100 to 160 °C as shown in Figure 2. Because of this phenomenon, classical three-phase separation is not possible without the addition of a diluent (natural gas condensate used at Peace River) to lower the bitumen density such that natural gravity separation can occur. The distance from the central plant facilities to the pad locations precludes either running a condensate line from the plant to the field facilities or installation of tankage for condensate storage due to cost. In addition, the cost of process equipment associated with three-phase separation is significantly higher.Hence two-phase separation was selected for well test application.In 2001, two pads of soak radial wells were developed to minimize costs while significantly increasing well productivity. As shown in Figure 1, the two pads (pad 30 and 31) consist of 8 wells each. The wells on Pad 30 have approximately 1000 m of total horizontal section while Pad 31 has eight wells with 1,500 m of horizontal section.The wells operate in a cyclic steam stimulation mode wherein the wells on each pad are steamed in unison for two months. Steam is injected into each well at rates of up to 800 t/d cold water equivalent (CWE) until a cumulative steam injection of 35,000 t has been attained. During steam injection cycles, surrounding reservoir pressure is increased from 1,000 (3,500 kPa for the first cycle) to 13,000 kPa.Once steam injection is complete, the wells are immediately placed on production. As the reservoir pressure is high, the wells will naturally flow without artificial lift for anywhere from 2 weeks to in excess of 2 months. During flowback, production temperatures up to 220 °C are seen. The wells are choked back to limit excessive fluid production and to minimize the risk of sand production. Keywords: society of petroleum engineers, fluid sample, oil-water cut analyser, test separator, complex reservoir, oil-water monitor, instrument, peace river, application, separation and treating Subjects: Processing Systems and Design, Formation Evaluation & Management, Unconventional and Complex Reservoirs, Separation and treating, Oil sand, oil shale, bitumen This content is only available via PDF. 2003. Society of Petroleum Engineers You can access this article if you purchase or spend a download.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction machine sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.
Scores du classifieur distillé par catégorie (deux têtes)
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,003 |
| Méta-épidémiologie (sens strict) | 0,001 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,002 | 0,001 |
| Études des sciences et des technologies | 0,001 | 0,000 |
| Communication savante | 0,001 | 0,001 |
| Science ouverte | 0,001 | 0,001 |
| Intégrité de la recherche | 0,001 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,043 | 0,017 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».