Partial SAGD Applications in the Jackfish SAGD Project
Pourquoi ce travail est dans la base
Une base qui oublie comment elle a trouvé un travail ne peut pas être vérifiée. Voici les voies qui ont admis celui-ci.
Notice bibliographique
Résumé
Abstract With SAGD operations, it is often inevitable to have shut-in time and turnaround periods because of facility, operation, and supply issues. During these shut-in periods, the gravity drainage of cooling bitumen and steam condensate continuously raises the liquid level over the production well. Therefore, the producer downhole temperature keeps decreasing. This situation makes the restart more difficult. Sometimes even if there is no shut-in, the production well also becomes cold after it is converted from circulation to Full SAGD. This paper classifies the SAGD operation modes into three categories, including Full SAGD, Semi-SAGD, and Partial SAGD. In Partial SAGD, the injector return is shut-in while steam injection continues in the long tubing or in the short tubing and annulus of the injector. The producer is operated with the appropriate steam injection rate to the long tubing. Numerical simulation results associated with Partial SAGD effect are presented. In addition, Partial SAGD applications in Jackfish SAGD project are also discussed. Introduction Up to the end of 2008, the number of commercial Steam-Assisted Gravity Drainage (SAGD) projects in Alberta has increased to 18 and 13 of them are on production (ERCB, 2008). As more projects come on stream, there is increased opportunity to gain valuable experience and improve SAGD performance. The typical SAGD process uses two parallel horizontal wells. The upper well is the steam injector and the lower well is the bitumen producer. It is common that the producer is completed with two tubing strings; a short tubing (ST) string landed at the heel and a long tubing (LT) string landed at the toe. For the injector, there are different completion designs. In the Jackfish project, dual tubing completions for both injector and producer are used and this completion style is considered in this paper. Operations at a SAGD project are often interrupted artificially by a number of issues associated with facility and material supply. During these shut-in periods, the steam chamber inside the reservoir becomes smaller. Cooling bitumen and steam condensate continuously raise the liquid level above the producer. Sometimes, even though there is no shut-in, either the whole horizontal section or just part of the producer becomes cold so that no effective production occurs. Figure 1 shows a typical producer response in the Jackfish SAGD project under these circumstances. Wells with dual tubing completions have the flexibility to adjust the injection and production to remedy this situation. This paper will describe and classify the options which are available to make the adjustment. Reservoir simulations with discretized well bore models are conducted to investigate the effect of some adjustments on SAGD performance. Field cases from the Jackfish SAGD project are also presented to illustrate the application result. Classification of SAGD Operation Modes Full SAGD mode is started after the steam circulation period. The SAGD operation modes can be classified into three major categories based on the steam injection and bitumen production options. The three categories are Full SAGD, Semi-SAGD, and Partial SAGD.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,001 |
| Science ouverte | 0,003 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle