Financial Risk and market Effects for the Congestion Costs of the electricity System in Italy
Notice bibliographique
Résumé
The physical and structural constraints of the electricity grid economically and financially affect the operators imposing on them a set of measures designed to contain the problem of electric congestions. The Congestion costs occur in the electricity market when the power flows, equivalent to a projection mapping of energy injection and withdrawal, established by the “electricity stock exchange” and by “bi-lateral contracts”, are incompatible with the transfer capacity guaranteed by the power grid, in required security conditions. Transfer restrictions in the national and transboundary transmission grid can potentially determine the market segmentation in different geographical areas, preventing the producers to compete freely to satisfy the overall demand in those areas. As a result of power congestions, those producers that have reduced limitations in the power transfer are obviously favored, also if in the presence of high marginal production costs and prices, leading to the constitution of pools of producers that de facto control the local market. Through a critical survey of the situation of the Italian electricity market the paper aims to describe and discuss the problem of power congestions costs, the electricity price formation and the congestion risk management.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».