Optimizing and Managing Coiled Tubing Frac Strings
Notice bibliographique
Résumé
Optimizing and Managing Coiled Tubing Frac Strings Serguei Kazakov; Serguei Kazakov Halliburton Energy Services, Inc. Search for other works by this author on: This Site Google Scholar Keith Rispler Keith Rispler Halliburton Energy Services, Inc. Search for other works by this author on: This Site Google Scholar Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, Houston, Texas, April 2000. Paper Number: SPE-60747-MS https://doi.org/10.2118/60747-MS Published: April 05 2000 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Kazakov, Serguei, and Keith Rispler. "Optimizing and Managing Coiled Tubing Frac Strings." Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, Houston, Texas, April 2000. doi: https://doi.org/10.2118/60747-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE/ICoTA Well Intervention Conference and Exhibition Search Advanced Search AbstractMultizonal coiled tubing fracturing (CT frac) services have been successfully performed in shallow gas fields in western Canada for more than 1 year. Properly managing and designing the serviceability of CT strings is critical to these operations.This paper discusses the practical and theoretical aspects of optimizing the frac-string design, changing the equipment geometry of the CT units, and using a CT fatigue model and fatigue-simulation software. The paper also discusses factors affecting the longevity and performance of frac strings, programs for continuously monitoring the service life of the strings, and actions considered for recovering and extending the fatigue life.With a properly designed and implemented comprehensive tubing management program, service operators in western Canada have helped ensure a high degree of personnel safety during fracturing while minimizing the risk of CT failure and maximizing pipe life.IntroductionFracture stimulation is required for economic gas production in the shallow gas fields of southeastern Alberta and southwestern Saskatchewan. In these fields, gas is produced from the Second White Specs, Medicine Hat, and the Lower and Upper Milk River formations. These formations are medium- to fine-grained sandstones and siltstones interbedded with shales and mudstones.The wells in these formations have traditionally been perforated and fractured with multiple operations at the wellsite; one operation is performed for every zone completed. The fracturing fluids used were predominantly crosslinked water energized with carbon dioxide (CO2) or nitrogen (N2). Previous fracture designs typically consisted of a small pad (3.0 to 5.0 m3, 20 to 30 tonnes of 20/40-mesh frac sand placed at an average concentration of approximately 1500 kg/m3).In the late 1990's, a new method of fracturing these wells was developed. This method, which involves CT and a selective-injection packer assembly, allows multiple fracture stimulations in one operation at the wellsite. The fluids (energized, crosslinked-water gels) and the fracture designs are similar. When this method is used, the service company typically fracture-stimulates more sections with smaller volumes of sand per fracture. Generally, the total volume of sand placed is similar to that for previous techniques. The pad volumes are generally limited to the CT volume, and sand concentrations of approximately 1500 kg/m3 are placed. The volume of proppant placed in these fractures ranged from 5.0 to 30 tonnes. The fractures were pumped down CT at rates of 1.5 to 2.0 m3/min and surface pressures of 35 to 40 MPa.CT/Fracture-String Design ConsiderationsDesigning strings for fracturing operations involves evaluating the different criteria the CT should meet, including fracture-stimulation design, CT mechanical parameters, and economics. The ultimate design goal is to meet these requirements while ensuring that the service string has adequate stress/force capabilities throughout its life, extending fatigue life and string revenue.High-pressure fracturing treatments with energized fluids can compromise personnel safety and potentially lead to catastrophic string failure. Because large-diameter CT has a shorter fatigue life than small-diameter CT, the service company had to continually investigate string serviceability and search for ways to optimize the parameters that influence the operational longevity of the CT frac strings. Keywords: frac string, wall thickness, cutoff, application, pipe, spe 60747, fatigue life, serviceability, coiled tubing operations, service life Subjects: Hydraulic Fracturing, Completion Installation and Operations, Coiled tubing operations This content is only available via PDF. 2000. Society of Petroleum Engineers You can access this article if you purchase or spend a download.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,001 | 0,001 |
| Méta-épidémiologie (sens large) | 0,001 | 0,000 |
| Bibliométrie | 0,000 | 0,001 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,001 | 0,002 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,001 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».