Evaluation of Construction Project’s Cost Using BIM Technology
Notice bibliographique
Résumé
In this research, a case study is explored and examined by choosing a construction project.The budget of this project is calculated and analyzed using two methods.A comparison between these two approaches is conducted in terms of performance, effort, accuracy, and cost of calculation.These two techniques are manual quantity surveying and numerical project take-off depending on BIM technology (REVIT software package).The quantity take-off of steel, concrete, and other vital architectural elements and structural building components was considered.The results of this work revealed that there are perfect agreements between the traditional cost-estimation method and the ANSYS numerical calculation associated with all construction elements and components, indicating that BIM technology can offer a reliable solution to determine the construction project cost with higher complexity and components.Furthermore, it was found that the use of REVIT software has cut a significant number of human errors that occurred during the estimation process and quantity take-off for the project cost.In addition, the results of the manual and numerical methods of cost calculation indicated that the REVIT software had saved much time and effort needed for engineers to estimate the budget related to this challenging case study that represents a hospital building with various structural components.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,001 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».