Pourquoi ce travail est dans la base
Une base qui oublie comment elle a trouvé un travail ne peut pas être vérifiée. Voici les voies qui ont admis celui-ci.
Notice bibliographique
Résumé
In this article I turn my attention to two hydropower plants, HPP Dabar and HPP Nevesinje, part of the massive Upper Horizons scheme, which is currently the largest infrastructural project in Bosnia and Herzegovina. Built by the China Energy Gezhouba and financed through a large loan from the Export–Import Bank of China, the enterprise forms a part of China’s Belt and Road Initiative, an unprecedented global development programme that involves nearly half of the world’s countries. The project is being built on the Zalomka, one of the largest sinking rivers in Bosnia and Herzegovina and the world, and its potential impacts are hotly debated and may be extremely far reaching. As Rob Nixon has argued, the mega-dam projects in many postcolonial nations have ‘depended’ on both physical structure and metaphorical discourse on ‘submergence’: of ‘disposable people and ecosystems, but also on the submerged structures of dependence that lay beneath the flamboyant engineering miracles’ (2011: 167). Drawing on these reflections and insights from the energy humanities, blue humanities and infrastructure studies, I consider dams as concretizations that ‘harness, produce, materialise, and symbolise’ (neo)colonial power relations (Max Haiven (2013) ‘The dammed of the Earth: Reading the mega-dam for the political unconscious of globalization’, in Cecilia Chen, Janine MacLeod and Astrida Neimanis (eds) Thinking with Water, Montreal: McGill-Queen’s University Press). Thus, from this perspective, this infrastructural project could be seen not only as ‘Chinese invasion’ through the Belt and Road Initiative, but also an invasion of nature by the nation state, often constituted as the necessary means to pursue a view of national and regional integration towards globalized modernity. Finally, I discuss an invasion of the dominant narrative by resistance, turning attention to the anti-damming intersectional and coalitional work in the Balkans, which includes protests, marches, forums, artistic interventions, and legal pressure aimed at stopping both local and the Chinese state-owned companies from dredging and blocking the rivers. Intervening in the normalized view of the extractive zone – the article argues – these acts of resistance form part of a broad struggle against what the anthropologist Anne Spice calls ‘invasive infrastructures’ (2018) that numerous communities are fighting against in the region (‘Fighting invasive infrastructures’, Environment and Society 9: 40–56).
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,001 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,001 |
| Études des sciences et des technologies | 0,001 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découle