An Integrated Building Information Modeling (BIM) and Circular Economy (CE) Model for the Management of Construction and Deconstruction Waste Based on Construction Methods
Notice bibliographique
Résumé
As the climate change signs become more noticeable, the concern to prioritize sustainability within the AEC industry intensifies. This particularly pertained to issues related to the demand of resources, the excessive consumption of raw materials, and the associated generated waste. Presently, the construction industry is ranked among the industries that are accountable for the global generation of solid waste and energy consumption, leading to detrimental environmental effects. Nonetheless, over the years, construction methods, technological innovations, and building practices have made considerable progress, influenced by a growing emphasis on sustainability, especially in energy conservation and in adopting the Industrialized Production layer of Construction 4.0 (i.e., modular prefabrication, 3D concrete printing, and BIM). The concept of Circular Economy (CE) has been identified as a potential solution to achieve sustainability in building construction through the design, construction, and end-of-life deconstruction processes that enhance the management of waste based on the framework that is related to reducing, reusing, and recycling. Moreover, information and data related to geolocation complement advanced digital technologies by providing a collaborative platform that supports the application of CE as a practical approach to sustainability. Thus, this study will provide a straightforward methodology for developing a model that integrates BIM and sustainable design with Circular Economy’s concept to enhance the sustainability of construction projects to minimize their waste based on various construction methods (i.e., conventional, modular, and 3D concrete printing). The proposed model interrelates tools and data for the evaluation and planning strategies for the construction and deconstruction waste (CDW) management at the design stage, including estimating the quantities of the wasted materials, quantifying the production rates of selected equipment for the waste handling (loading and hauling) at the various stages of a project as well their associated cost. The proposed model will help users to calculate the quantity of construction and deconstruction waste (CDW) during the design of buildings based on their different construction methods at the early stage by using the concept of Design for Deconstruction (DfD); sustainable construction methods; and deconstruction process for waste management, which will lead to the suitable construction method.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,002 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».