Report of Select committee on Georgian Bay and Lake Ontario ship canal.
Notice bibliographique
Résumé
Lake Simcoe, and between Lake Simcoe and Lake Huron, with a view to the construction of a Ship Canal, should be immediately proceeded with, and that the various towns and counties interested in the work, be called upon to subscribe sufficient funds for the expense of the survey." The Committee appointed by the Convention also instructed me : -"To complete the survey of a route for the Canal from Toronto, via Lake Simcoe, to the Geor- gian Bay on Lake Huron, and to report to this Committee, with a topographical descrip- tion of the country, levels, heights, sections and approximate estimates for the construction of a Canal capable of passing vessels of one thousand tons burthen ; a profile of the line to be furnished with the Report." The survey was continued during the au f umn of 1855 and the following winter, but was cot finally completed until the autumn of 1*57, during; which period 166 miles were surveyed and levelled; 100 miles in addition were explored and partially surveyed, in order to procure sufficient data to carry out the instructions of the Committee, and to ascertain the most practicable route.The maps and profiles of four routes were lithographed and published with the reports, copies of which were laid before Parliament during the Session of 1858.2. Was any other gentleman associated with you as Consulting Engineer, or other* wise ?Ans.It was arranged by the Committee that one of the most eminent Engineers residing in the Western States should inspect the various proposed routes, and act as Consulting Engineer during the progress of the survey.In the autumn of 1856, when the surveys were sufficiently advanced, Colonel Mason personally inspected the proposed termini on Lakes Ontario and Huron, and also the lines of the various routes, particularly those portions in which the deepest cuttings were situated, and after a full and careful examination, recorded his opinion, as Consulting Engineer, in his report to the Committee, copies of which report were presented to each member of Parliament in 1858.I may mention here, that Colonel Mason has been engaged for several years past in the construction of railroads and other public works in the Western States, including the Illinois Central Railroad, over 800 miles in length, of which work he was the Chief Engineer, afterwards Superintendent, and is now the Commissioner in the Land Department of that railroad. State to the Committee the conclusions you have arrived at from your survey ; andif, in your opinion, practicable, the grounds upon which that opinion is founded ?Ans.The duty that was assigned to me by the Committee, in connection with the project, was, as stated in reply to the Question No. l,to report the levels, heights, sections, and approximate estimates lor the construction of a canal capable of passing vessels of one thousand tons burden.The Report comprised -1st, Terminal harbour accommjdatioo ; 2nd, Water supply to the Canal ; 3rd, Cost of construction ; 4th to 7th, Comparisons and conclusion.Terminal Harbours.-Inaccordance with the instructions of the Committee, Toronto harbour was made the starting point from Lake Ontario.The survey was commenced im- mediately west of the Old Fort, and the ground between this pjint and Lambton, on the River Humber, was accurately measured, and levelled along the banks of the river, and a branch of the Don, which crosses Yonge Street immediately north of the city, continuing along the base of the Davenport Hill until it joined the western line.The intention of surveying and levelling these lines was to ascertain the approximate elevation of the ground above the level of the Humber River, and otherwise determiue the feasibility of constructing both those branches, not only as termini, but also as an available water power, the future advantages of which would be incalculable to the prosperity of the city for manufacturing and ordinary mechanical purposes.The cost of constructing those branches has not been estimated, and, though practicable and extremely desirable, as far as the local interests of the city of Toronto are concerned, lor the reasons stated in the Report, a copy of which is herewith submitted, the Hurber Ray, about three miles west of the city of Toronto, was recommended as the southern terminal entrance, and Nottawasaga Bay, on Lake Kuron, was considered as offering the greatest advantages for a northern terminal entrance, both harbours being easy of access, commodious and safe, in which opinion I was fuily sustained by Colonel Mason, the Consulting Engineer, who personally inspected the termini.Water Supply.-According to the calculations in the Report, the supply afforded by 1 299,
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction machine sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.
Scores du classifieur distillé par catégorie (deux têtes)
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,002 | 0,003 |
| Méta-épidémiologie (sens strict) | 0,001 | 0,001 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,001 | 0,001 |
| Études des sciences et des technologies | 0,004 | 0,001 |
| Communication savante | 0,003 | 0,001 |
| Science ouverte | 0,001 | 0,002 |
| Intégrité de la recherche | 0,004 | 0,002 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,120 | 0,038 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».