Modeling Cost of Quality in the Construction Industry \nA closer look at the Procurement Process using System Dynamics
Notice bibliographique
Résumé
The aim of this research is to develop the Cost of Quality (COQ) model for the procurement process of the construction industry and establish a general course of action for minimizing quality costs. A case study in a large Canadian construction company was conducted and the use of the Prevention-Appraisal-Failure (PAF) approach for the COQ model of the procurement process was explored. In contrast to the conventional COQ analysis we take into account not only the internal quality costs within the company, but also the costs of its suppliers. Several different policies were designed and their effects on quality costs investigated through System Dynamics (SD) simulation. The findings suggest that Prevention costs should be increased to minimize failures. It was also found that Appraisal cost is quite high in the procurement process and should be reduced in order to minimize overall COQ. However, this strategy could increase failure occurrences thereby damaging a company’s reputation. The possible reductions of Appraisal cost in the construction companies should thus be carefully considered.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction machine sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Le volet Gemma est une étiquette directe du modèle pour chaque travail de la base, lue sur la notice réduite au titre. Le volet Codex est un classifieur appris des 10 348 étiquettes directes de Codex et calibré sur les taux pondérés de l'échantillon; les champs sans appui suffisant ne portent aucun appel Codex. Le mode candidate est l'union des deux volets; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont pas des étiquettes humaines.
Scores du classifieur distillé par catégorie (deux têtes)
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,004 |
| Méta-épidémiologie (sens strict) | 0,001 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,001 |
| Bibliométrie | 0,001 | 0,001 |
| Études des sciences et des technologies | 0,001 | 0,001 |
| Communication savante | 0,002 | 0,002 |
| Science ouverte | 0,001 | 0,001 |
| Intégrité de la recherche | 0,001 | 0,001 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,003 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule source (Gemma direct ou Codex distillé), pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».