Resilience-Based Asset Management Framework for Pavement Maintenance and Rehabilitation
Notice bibliographique
Résumé
Infrastructure systems play a pivotal role in developing the economy and public services, which positively affects the quality of life of the communities. Thus, it is of paramount importance to investigate the current infrastructure capacity, assess its capability to sustain the anticipated disruptions, then plan the necessary recovery strategies to reduce their detrimental significance and increase their resilience. The growing decline in roads condition has recently grasped the attention of numerous researchers and practitioners regarding road resiliency during its life-cycle. 62.6% of roads in Canada are in good condition, according to Canada Infrastructure Report (2016). Nevertheless, with current investment rates, significant road networks will suffer a decline in their condition and will be vulnerable to sudden failure (FCM 2016). On the other side, the current situation in the U.S is inferior, where roads are in poor condition, classified as grade D, and not to mention the insufficient investment required to maintain road networks (ASCE, 2017). \nAccordingly, this research tackles pavement resilience from an asset management perspective where; it highlights the fact that infrastructure should maintain its resiliency during its life-cycle to maintain a minimum acceptable Level of Service (LOS). The main objective of this research is to develop a resilience-based asset management framework for pavement maintenance and rehabilitation (M&R). The proposed methodology involves a set of sequential steps as follows; 1) define infrastructure resilience, 2) investigate resilience-related indicators in the same dimension of resilience definition, 3) develop a resilience-based asset management model for M&R decisions, 4) optimize the attained M&R plan for short and long-term decisions, and 5) formulate a resilience index. First, resilience is defined based on a comprehensive review of the previous literature and targeting an integrated definition that combines both asset management and resilience concepts. Then, resilience-associated indicators are investigated based on the predefined resilience definition, and the different indicators are later classified and modeled for a pavement network. \nThe resilience-based asset management model is carried out through the development of five components; 1) a central database of asset inventory that includes numerous data that would serve as input for the proposed model, 2) a pavement condition and level of service (LOS) assessment models that encompass the different effects of climatic conditions on pavement condition, surface, and structural conditions, and LOS, 3) regression modeling of the effect of Freeze-Thaw on pavement and investigation of flooding effect on both pavement surface and structural conditions, 4) financial and temporal models for recovery/intervention actions are formulated through computational models that account for the intervention costs and time, then link them to the later used optimization model, and 5) an optimization model to formulate the mathematical problem for the proposed resilience assessment approach and integrate the formerly-mentioned components. The utilized optimization model employs a single objective that relies on a combination of meta-heuristic rules. Genetic algorithms are utilized as an innovative idea that formulates the mathematical denotation for the proposed resilience definition. Principle Components Analysis (PCA) is used and manipulated as a novel method to establish resilience indicators’ weights and compute the resilience index. A PCA framework is developed based on optimization model output to generate the required weights for the desired resilience index. This model offers dynamic resilience indicators’ weights and, therefore, a dynamic resilience index. Resiliency is a dynamic feature for infrastructure systems, where it differs during their lifecycle with the change in maintenance and rehabilitation plans, systems retrofit, and the occurring disruptive events throughout their life-cycle. \nThe proposed model serves as an initial step toward providing more resilient municipal infrastructures. The model emphasizes that recovery plans should follow proactive measures to adapt to sudden or unforeseen events rather than just adopting a reactive approach, which deals with the sudden events after their occurrence. This pavement resilience assessment framework is also beneficial for asset management experts. M&R plans would not only target enhancing or restoring pavement condition or LOS but also incorporate the implementation of proper recovery strategies for both regular and extreme events into the M&R plan while taking the natural deterioration and aging effects into account. Two case studies were undertaken to demonstrate the effectiveness of the proposed methodology.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,001 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,001 | 0,001 |
| Études des sciences et des technologies | 0,001 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,001 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».