DESIGN AND CONTRACTING STRATEGY FOR A SHORT TUNNEL IN MIXED GROUND CONDITIONS
Notice bibliographique
Résumé
One of the key decisions in the planning and implementation of a tunnel project is the selection of the most appropriate tunnelling technology. Decision factoring tunnel projects often include: subsurface conditions; groundwater; tunnel size and spacing; depth below grade; proximity to buildings and facilities; local contractor capability and availability; risks due to ground loss; schedule; and, of course, costs. Approximately 40% of the City of Edmonton Light Rail Transit system's 12.3 km consists of underground works successfully constructed using Tunnel Boring Machine (TBM), Sequential Excavation Method (SEM) tunnelling and cut-and-cover techniques. The latest LRT extension consists of twin tunnels of complex geometry only 300 meters long, which pass under existing buildings and utilities and through a number of geological units. Due to this relatively short length of tunnel, the difficult ground conditions and the lack of local tunnel construction experience, the decision regarding the most appropriate tunnelling technology was perhaps more challenging than for any of the City's previous tunnel projects. This paper presents the design and contracting strategies implemented to mitigate tunnelling risks and to maximize interest and competition for the project.
Récupéré en direct depuis OpenAlex et désinversé. Les résumés ne sont pas conservés dans cette base de données : les index inversés représentent 8,6 Go des 9,3 Go de texte de la base, et le serveur dispose de 13 Go libres.
Comment cette classification a été obtenuedéplier
Prédiction distillée sur la base complète
Imitation des enseignantsNi prévalence calibrée, ni vérité terrain. Validation humaine à venir. Apprise à partir de 10 348 étiquettes directes de Codex et de 10 348 étiquettes directes de Gemma. Le mode candidate est l'union des têtes enseignantes seuillées; le consensus est leur intersection. Ces sorties portent le statut machine_predicted_unvalidated et ne sont ni des étiquettes humaines ni des étiquettes directes de modèles de pointe.
Scores Codex et Gemma par catégorie
| Catégorie | Codex | Gemma |
|---|---|---|
| Métarecherche | 0,000 | 0,000 |
| Méta-épidémiologie (sens strict) | 0,000 | 0,000 |
| Méta-épidémiologie (sens large) | 0,000 | 0,000 |
| Bibliométrie | 0,000 | 0,000 |
| Études des sciences et des technologies | 0,000 | 0,000 |
| Communication savante | 0,000 | 0,000 |
| Science ouverte | 0,000 | 0,000 |
| Intégrité de la recherche | 0,000 | 0,000 |
| Charge utile insuffisante (le modèle a refusé de juger) | 0,000 | 0,000 |
Scores machine (provisoires)
Les deux têtes enseignantes du modèle étudiant, lues sur ce travail. Un score ordonne la base pour la relecture; il n'affirme jamais une catégorie, et le statut de validation accompagne chaque rangée tel quel.
Scores de référence d'un modèle non mature (critères de maturité non atteints, 7 itérations). Un score ordonne; il n'affirme jamais une catégorie.
score_only:v0-immature-baseline · tel quel depuis la passe de notation : score_only signifie que le nombre peut ordonner les travaux, et qu'aucune étiquette de catégorie n'en découleClassification
machine, non validéePrédiction automatique; un appel candidat d’une seule tête enseignante, pas un consensus.
Le détail, modèle par modèle et score par score, se trouve en fin de page sous « Comment cette classification a été obtenue ».