Erosion and devastation of river Subansiri and future downstream impacts of large dam : a case study from India
Bibliographic record
Abstract
Hydro-power projects are generally categorized in two segments — small and large. The 2,000 MW project is being developed by NHPC in Garukamukh, at a cost of approximately $2 billion and height of the dam is 116 metre. But North-east India has a complicated geology and the lower Subansiri is situated in the seismic zone ‘V’. So large dam is not suitable for this region as they may fail during an earthquake. River Subansiri has been created tremendous devastation in the riparian villages by its natural flood. So small hydro–power projects are preferable than big projects. All the projects will have downstream impacts. So, NHPC or sensible state should reconsider their plans before it is too late.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame machine prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.
Distilled classifier scores by category (both heads)
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.001 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.001 |
| Bibliometrics | 0.001 | 0.002 |
| Science and technology studies | 0.002 | 0.001 |
| Scholarly communication | 0.001 | 0.001 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.001 | 0.001 |
| Insufficient payload (model declined to judge) | 0.002 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".