Norsk Hydro's Utkal venture in Orissa, India

2003· book-chapter· en· W1511957431 on OpenAlexaboutno aff
Siri Terjesen

Bibliographic record

VenueQUT ePrints (Queensland University of Technology) · 2003
Typebook-chapter
Languageen
FieldSocial Sciences
TopicHydropower, Displacement, Environmental Impact
Canadian institutionsnot available
Fundersnot available
KeywordsCorporate social responsibilityMultinational corporationShareholderSubsidiaryManagementJoint ventureBusiness ethicsPolitical scienceBusinessEngineeringCorporate governanceFinancePublic relationsEconomicsBusiness administration
DOInot available

Abstract

fetched live from OpenAlex

This paper will begin with a brief overview of the Norsk Hydro ASA’s (hereinafter Hydro) Utkal Alumina International (hereinafter Utkal) project in Orissa, India, followed by cultural and ethical analyses and recommendations for next steps. Previous research suggests that corporations desire practitioner insights on this intersection of culture and ethics (Donaldson, 1989, Dubinsky and Loken 1989, Vogel 1992, Robertson and Fadil 1997). Theory will be balanced with press releases and personal interviews with Hydro corporate offices and NGO/watch groups. The case is set in June 2001 when Hydro was still a 45% shareholder. The focus will be limited to Hydro though other joint venture partners are Canadian Alcan and the Indian Aluminum Company, Indal (owned by conglomerate Indian business house Hindalco), with 35% and 20% ownership respectively. Hydro was selected as this multinational corporation (MNC) has begun to engage in rigorous dialogue regarding ethical challenges and corporate social responsibility (CSR). The Utkal project site juxtaposes this ethical rhetoric with the real and continual dilemmas faced since project inception in 1993. In 2001, Indian police killed three villagers and severely injured eight others during a non-violent protest of Utkal activities. Case Overview: With an investment of US $1 billion, the Utkal project will establish a bauxite mine at the Baphlimali plateau and an alumina-refining factory in the Rayagada district of Orissa, East India. The project is expected to supply over thirty years of alumina production for export: 1 million tons in the first phase and 2.5 million tons during the second phase. This will extract an estimated 173 million tons over a thirty-year period. These alumina exports will help to meet the burgeoning international demand (4-5% yearly increase) for this strong, ductile light metal. Utkal implementation is expected to begin in mid-2001, with the first production milestone set for 2005. Meanwhile, the Utkal venture has stirred massive international controversy due to the potential human and environmental consequences. In order to acquire land, 750 people in three villages (Kucheipadar, Korala, and Komphora) will be forced to move from their homes. Approximately five hundred others will lose land and tens of villages will have reduced access to common resources such as water and agricultural and grazing lands. In total, NGOs estimate 60,000 people will be directly or indirectly negatively impacted by the Utkal venture. Most of these local inhabitants are farmers and approximately 60% percent belong to native tribes in the lowest Hindu castes. Within the eastern state of Orissa (where the Utkal venture is located), 44% of the population live below the poverty line, 51% are illiterate, and 47% do not have access to electricity, safe drinking water, and toilets. Overall, India is ranked 129th of 174 countries on the UNDP survey of human development which account for well-being components such as life expectancy, education, and gender equality. This low placement is due in part to limited government spending (just 5.1% of GDP) on health and education. (See Appendix 1 for quality of life data. See Appendices 2 and 3 for macroeconomic details.) Environmental groups are also concerned with the effects to the land. Estimates differ. The watch group, One World, claims that the 1,750 hectares needed for facilities would result in the razing of 100 hills to the ground, and the drying up of 700 streams and numerous forests and grasslands as an area of 130,081 hectares morphs into a "barren desert." Meanwhile, Utkal contends that a far smaller area of land will be raised and only 10% of the Bahra Nadi river (in the driest year) could be used. Utkal planted approximately 80,000 trees in the year 2000. They expect to plant a few million trees in the area. Moreover, the estimated 2 million tones of industrial sludge produced each year will silt up potable water resources and other reservoirs. Utkal contends that there will be no silting of resources, the project will utilise dry stacking with liners and collection pond and water recycling. Norwegian consultants from the Christian Michelsen Institute (CMI) initially approved the environmental assessment. However, CMI’s request for more time to perform a complete analysis of social impacts was denied. Utkal’s sponsors are no strangers to previous environmental catastrophes. The Indian State Pollution Control Board reports that Indal’s Hirakud plant emits .5 million kg of fluorine each year—contaminating shallow ground water and soil. Hydro’s S&S PVC-compound plant in Tamil Nadu, South India, was found to have "two sets" of standards governing health, safety, and the environment. In this case, Norwatch reported the use of cadmium in the production process, the provision of asbestos gloves for workers, and the lack of an adequate waste treatment center. All of these conditions are permissible in India, but outlawed in Norway. Government institutions (with or without proper resource and borrowing privileges) approved the project, and police and local "authorities" have attempted to quell the non-violent village protestors. Increasingly violent measures have been used to force villagers to sign away land against their will at minimal, if any, repayment. Meanwhile, Hydro’s promises to provide jobs, enable open communication, protect and enhance human welfare have generally fallen far short of expectations. Hydro contends that international NGOs have teamed with local organizations to oppose the development on political and ideological grounds.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow), Research integrity, Insufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.949
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0010.000
Science and technology studies0.0000.001
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.010
GPT teacher head0.285
Teacher spread0.275 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2003
Admission routes1
Has abstractyes

Explore more

Same venueQUT ePrints (Queensland University of Technology)Same topicHydropower, Displacement, Environmental ImpactFrench-language works237,207