Bibliographic record
Abstract
Many cities in the United States are currently developing long term control plans (LTCPs) to control combined sewer overflows (CSO) and sanitary sewer overflows (SSO). Most of these plans are mandated by Clean Water Act regulatory requirements such as consent orders from state environmental protection agencies and consent decrees from the U.S. Environmental Protection Agency (USEPA). These plans are required to recommend a facility plan to meet an appropriate level of CSO and SSO control. Development of these plans requires innovative, efficient and cost effective surveying, mapping, monitoring, modeling, costing and alternative ranking techniques. This chapter presents a case study to illustrate innovative LTCP development techniques used in an LTCP project in Pennsylvania completed in 2011. The chapter focuses on plan development, GIS mapping, GPS surveys, flow monitoring, hydrologic and hydraulic (H&H) modeling, model calibration, and public participation techniques used in the project.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".