MétaCan
Menu
Back to cohort
Record W1976328112 · doi:10.1002/pip.998

Solar based large scale power plants: what is the best option?

2010· article· en· W1976328112 on OpenAlexaffabout
Farid Bensebaa

Bibliographic record

VenueProgress in Photovoltaics Research and Applications · 2010
Typearticle
Languageen
FieldEnergy
TopicSolar Thermal and Photovoltaic Systems
Canadian institutionsNational Research Council Canada
Fundersnot available
KeywordsDispatchable generationCapital costPhotovoltaic systemThermal energy storageEnergy storageSolar powerGrid paritySolar energyElectricity generationElectricityStand-alone power systemConcentrated solar powerEnvironmental scienceEnvironmental economicsDistributed generationProcess engineeringEngineeringPhotovoltaicsRenewable energyElectrical engineeringPower (physics)EconomicsPhysics

Abstract

fetched live from OpenAlex

Abstract There are very few published data comparing performance and cost of thermal and photovoltaic (PV) based solar power generations. With recent intense technology and business developments there is a need to establish a comparison between these two solar energy options. We have developed a simple model to compare electricity cost using these two options without any additional fuel source of hybridization. Capital along with operation and maintenance (O&M) costs and other parameters from existing large scale solar farms are used to reflect actual project costs. To compete with traditional sources of power generation, solar technologies need to provide dispatchable electric power to respond to demand during peak hours. Different solutions for energy storage are available. In spite of their high capital cost, adding energy storage is considered a better long term solution than hybrid solar systems for large scale power plants. For this reason, a comparison between the two solar options is also provided that include energy storage. Although electricity storage is more expensive than thermal storage, PV power remains a competitive option. Expenses related to O&M in solar thermal plant are about ten times higher than PV, an important factor resulting in higher energy cost. Based on data from proven commercial technologies, this study showed that PV holds a slight advantage even when energy storage is included. Copyright © 2010 Crown in the right of Canada. Published by John Wiley & Sons, Ltd.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.002
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.913
Threshold uncertainty score0.618

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0020.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0010.001
Scholarly communication0.0010.000
Open science0.0010.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.031
GPT teacher head0.341
Teacher spread0.309 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations16
Published2010
Admission routes2
Has abstractyes

Explore more

Same venueProgress in Photovoltaics Research and ApplicationsSame topicSolar Thermal and Photovoltaic SystemsFrench-language works237,207