Primary Research of the Advantages and the Cost Control of the ABC & EVA Integrated System
Why this work is in the frame
A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.
Bibliographic record
Abstract
The integrated product of Activity-Based Costing (ABC) and Economic Value Added (EVA) is the ABC & EVA system, i.e. the integrated cost system. Traditional ABC method gives priority to the interior activity chain of enterprise to implement the cost analysis, but ignores the capital cost, so the cost accounting is not complete. The ABC & EVA system brings the capital cost into the cost management, which could not only open out the real economic value created by the cost objects, but extend the pure cost computation of ABC to the performance evaluation. Based on the principle of the ABC & EVA system, the enterprise cost control strategies under the integrated cost system are proposed.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.005 | 0.002 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.001 |
| Science and technology studies | 0.000 | 0.001 |
| Scholarly communication | 0.000 | 0.000 |
| Open science | 0.001 | 0.001 |
| Research integrity | 0.000 | 0.001 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it