MétaCan
Menu
Back to cohort
Record W1980096249 · doi:10.1108/17538371111144166

The social reality of organisational project management at the interface between networks and hierarchy

2011· article· en· W1980096249 on OpenAlexaff
Monique Aubry

Bibliographic record

VenueInternational Journal of Managing Projects in Business · 2011
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsUniversité du Québec à Montréal
Fundersnot available
KeywordsProject managementCorporate governanceDeliverableNegotiationKnowledge managementTransaction costProcess managementHierarchyActor–network theorySociologyComputer scienceBusinessManagement scienceManagementEngineeringPolitical scienceEconomics

Abstract

fetched live from OpenAlex

Purpose Today's organisations still face the duality of organising for both innovation and projects through organic structures while at the same time maintaining stability within their hierarchical structures. Issues, tensions and conflicts arise at the interfaces between these two/competing modes of organising. The purpose of this paper is to explore what really happens at the interfaces between the structures and governance modes that result from the prevalence of project‐oriented organisations. The theoretical framework is based upon the actor‐network theory (ANT) in order to capture networks construction around project management offices (PMO) deliverables that cross multiple organisational boundaries. Design/methodology/approach This research is of explorative nature. Even though the number of cases is limited to two, a strong research design was obtained through maximizing together their homogeneity and heterogeneity. Data were primarily collected from semi‐directed interviews with 29 individuals. Data analysis were done within a grounded theory approach. This study focus on one particular PMO deliverable: the project status report. The itinerary of the project status report was followed within each organisation. Findings What this study shows is the complexity of the translation process followed by a project status report. It highlighted specifically the existence of multiple arenas for negotiation. Interfaces can then be seen as translation centers where multiple perspectives on the project are discussed. Issues, tensions and conflicts are to be resolved when converging towards an irreversible unique point of control. Translations are not free. They incurred significant transaction costs which are invisible to the management team. Research limitations/implications While many other perspectives would permit a better understanding of what happens at the interface between hierarchy and projects, this research focused on networks constructlon within the ANT framework. This research is exploratory and as such there are certain inherent limitations. First, it was limited to two case studies only. Second, only one deliverable was scrutinised through ANT. Further research should also be undertaken to link project monitoring and control functions to project governance. Practical implications Practical implications relate to the capability of anticipating the consequences of organising within dual structures. This research leads to three major conclusions: PMO is part of the power system and politics; there are costs to hyper‐control; and interfaces could be seen as learning opportunities. Originality/value This originality of this paper is twofold: the research subject and the theoretical framework. First, the research subject looked at politics and power systems within the organisational project management. While previous researches have identified issues, tensions and conflicts surrounding the management of multiple projects, none has clearly focused on this subject. Second, this research adopted asocial approach based on an ANT framework. This approach focuses on the networks construction where issues, tensions and conflicts can be observed while they unfold.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.026
metaresearch head score (Gemma)0.029
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Qualitative · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.026
Threshold uncertainty score0.137

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0260.029
Meta-epidemiology (narrow)0.0000.001
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0030.003
Science and technology studies0.0160.069
Scholarly communication0.0210.024
Open science0.0020.012
Research integrity0.0030.004
Insufficient payload (model declined to judge)0.0040.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.140
GPT teacher head0.401
Teacher spread0.261 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designQualitative
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations35
Published2011
Admission routes1
Has abstractyes

Explore more

Same venueInternational Journal of Managing Projects in BusinessSame topicConstruction Project Management and PerformanceFrench-language works237,207