MétaCan
Menu
Back to cohort
Record W1981675520 · doi:10.5539/emr.v4n1p5

A Qualitative Enquiry into Professional Project Management Practices in the Ghanaian Construction Industry

2015· article· en· W1981675520 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

venuePublished in a venue whose home country is Canada.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueEngineering Management Research · 2015
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsnot available
Fundersnot available
KeywordsPopularityScheduleProject managementConstruction industryBusinessQualitative researchResource (disambiguation)Knowledge managementPublic relationsEngineeringManagementPolitical scienceSociologyComputer scienceEconomics

Abstract

fetched live from OpenAlex

Professional Project Management Practice (PPMP) has become a resource tool in the 21stcentury in diverse discipline, especially the construction industry where the genesis of the concept and its theory began. To this extent, Ghana has recently added an impetus to this popularity for the first time specifically mentioning and recognizing the title project managers (PMs) in the condition of contract for medium-sized works. PPMP continues to grow in the construction industry. However, there is lack of consensus and controversyamong practitioners and researchers onthe concept. This paper elicits the views of twenty major stakeholders in establishing a common mechanism in understanding the concept. The methodology was based on schedule interview with identified stakeholders and qualitative approach was used in the discussion. The findings of this study indicate that while theoretical knowledge exists, there is a lack of practical knowledge of the Professional Project Management among construction stakeholders. The implication of the findings is for the future development of the project management profession in Ghana and developing countries facing similar challenges as the industry advances.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.028
metaresearch head score (Gemma)0.001
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.429
Threshold uncertainty score0.982

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0280.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0030.005
Science and technology studies0.0000.000
Scholarly communication0.0010.001
Open science0.0020.001
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.538
GPT teacher head0.596
Teacher spread0.058 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it