MétaCan
Menu
Back to cohort
Record W1987340305 · doi:10.1061/9780784413067.169

Construction of Ocean Reef Islands Residential Community

2013· article· en· W1987340305 on OpenAlexaff
J.L.G. Fierro, A. Otachi E. O. Magana, Manfred H. Zinserling

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEarth and Planetary Sciences
TopicCoastal and Marine Dynamics
Canadian institutionsBerger (Canada)
Fundersnot available
KeywordsMainlandBayLand reclamationSubmarine pipelineGeographyReefGeologyArchaeologyDikePeninsulaOceanographyPaleontology

Abstract

fetched live from OpenAlex

Two man-made residential islands are being constructed offshore in the prime residential district of Punta Pacifica in central Panama City, Panama. These private islands are being developed by Grupo Los Pueblos for individual home sites and condominiums with unobstructed views of the Pacific Ocean. Breakwaters and a marina with over 190 slips are located between the two islands. The islands are perhaps the only artificial islands to be built in the western hemisphere in recent times. The islands are being reclaimed from the Bay of Panama through a design/build contract with equity participation by the contractor. Their construction consists of a rock dike perimeter (bund) backfilled with marine sand and riprap wave protection. The larger, recently constructed La Santa Maria Island has an area of 10.3 hectares (25.5 acres) and was developed first. This island is connected to the mainland by a bridge and also contains the central parking garage for the development. The second island, La Pinta, will have an area of 8.7 hectares (21.5 acres). This paper describes the planning, design, and construction method for the reclamation of the islands. It also presents information about the challenges and solutions for constructing the islands entirely from the sea in an environmentally sensitive area and close to an exclusive residential neighborhood. Six classifications of rock materials were quarried on the mainland 30 kilometers (16 nautical miles) west of the project and barged to the site. This work proceeded around the clock for approximately 18 months. Marine sand was mined around the clock for approximately four months at a concession area approximately 120 kilometers (65 nautical miles) south of the site and delivered at high tide. The sand fill was vibro-compacted and utilities were installed to complete the land reclamation. Over 2.4 million cubic meters (3.1 million cubic yards) of rock and sand fill went into the creation of La Santa Maria Island, and it is estimated that over 2.3 million cubic meters (3 million cubic yards) of rock and sand fill will be required to create the second island and the breakwaters.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.068
Threshold uncertainty score0.134

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.001
Science and technology studies0.0040.001
Scholarly communication0.0020.001
Open science0.0010.004
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0160.002

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.183
Teacher spread0.175 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2013
Admission routes1
Has abstractyes

Explore more

Same topicCoastal and Marine DynamicsFrench-language works237,207