MétaCan
Menu
Back to cohort
Record W1994410285 · doi:10.2523/iptc-11045-abstract

The Belanak FPSO Project - A Description of the Challenges in Designing and Building One of the Most Complex FPSOS to Date and the First To Incorporate LPG Processing and Export

2005· article· en· W1994410285 on OpenAlexaff
M.E. New, J.E. Smith

Bibliographic record

VenueInternational Petroleum Technology Conference · 2005
Typearticle
Languageen
FieldEngineering
TopicMarine and Offshore Engineering Studies
Canadian institutionsConocoPhillips (Canada)
Fundersnot available
KeywordsWellheadEngineeringPipeline transportStorage tankMarine engineeringCivil engineeringPetroleum engineeringWaste managementEnvironmental engineering

Abstract

fetched live from OpenAlex

This reference is for an abstract only. A full paper was not submitted for this conference. Abstract The Belanak FPSO was installed in the Belanak Field in October 2004 and should reach full production in the 3rd quarter of 2005. It will form the central production hub for a number of fields in Indonesia's West Natuna Seaarea, including Belanak, Belut, Kerisi and Tawes. ConocoPhillips is the operator for Block B with Inpex and ChevronTexaco as equity partners. Belanak has the capability to process and export 350mmscfd of sales quality gas, up to100,000 bpd of stabilized crude and 23,000 bpd of LPG in separate propane and butane streams. Flowlines from two 24 slot wellhead platforms transport raw well fluids to the FPSO, where they are processed and exported as crude via a loading buoy, gas via pipelines to Malaysia and Singapore or as LPG to a separate storage tanker to be moored in the Belanak Field. The Belanak facilities are designed for a 30 year life and offer considerable flexibility to accommodate future fields and deal with incoming hydrocarbon streams as well as deal with H2S, CO2, Mercury and Mercaptans. The vessel was designed and built in Asia with project management and design being conducted in Singapore, the 285m hull was fabricated in China, and the topsides were built and integrated in Indonesia. With approximately 25,000tonnes of topsides process equipment which includes LPG fractionation as well as 1.2 million barrels of oil storage, Belanak is one of the most complex FPSOs built by the industry to date. This paper will further describe the Belanak FPSO and discuss some of the challenges that the operator and its contractors faced in designing and delivering this production facility on schedule and within budget expectations.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.414
Threshold uncertainty score0.251

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.037
GPT teacher head0.239
Teacher spread0.202 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2005
Admission routes1
Has abstractyes

Explore more

Same venueInternational Petroleum Technology ConferenceSame topicMarine and Offshore Engineering StudiesFrench-language works237,207