Power Generation and Superheater Upgrade Project at the Burnaby MSW Plant

2003· article· en· W1994466114 on OpenAlexaboutno aff
Leo Lakowski, Russ Anderson, Ron Richter, Marcel D. Berz, Michael L. Britt, J.F. La Fond

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicThermochemical Biomass Conversion Processes
Canadian institutionsnot available
Fundersnot available
KeywordsSuperheaterBoiler (water heating)EngineeringUpgradeWaste managementPower stationElectricity generationSteam-electric power stationProcess engineeringSteam drumSteam turbineTurbineMechanical engineeringSuperheated steamCombined cycleElectrical engineeringPower (physics)Computer science

Abstract

fetched live from OpenAlex

Montenay Inc. operates a municipal solid waste (MSW) incinerator plant located in Burnaby, British Columbia. The facility operates three essentially identical boilers that were designed to generate slightly superheated steam at 248°C (478°F) and 3,140 kPa (455 psig). The plant was originally sized to supply process steam for export to an adjacent industrial plant. The fraction of steam that was exported decreased in recent years to about 35% of the production with the remainder being condensed. This has caused Montenay Inc. to initiate a power generation project with the goal to improve the plants energy efficiency and generate additional revenues by purchasing and operating a steam turbine generator. A superheater upgrade was required to raise the final steam temperature to a level that was suitable for use in an efficient steam turbine-generator. Jansen Combustion and Boiler Technologies Inc. (JANSEN) was contracted to perform the process and design engineering for the required boiler modifications. The project work included defining target process conditions, deriving conceptual design options, sizing the new superheater, deciding on material selection, preparing equipment specifications, and supplying the fabrication and installation drawings. The boiler modifications has been implemented in all three units in spring 2003. Power production will start in early summer 2003.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: none
Teacher disagreement score0.081
Threshold uncertainty score0.162

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0010.000
Scholarly communication0.0010.000
Open science0.0010.000
Research integrity0.0000.001
Insufficient payload (model declined to judge)0.0070.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.012
GPT teacher head0.194
Teacher spread0.182 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2003
Admission routes1
Has abstractyes

Explore more

Same topicThermochemical Biomass Conversion ProcessesFrench-language works237,207