MétaCan
Menu
Back to cohort
Record W2010079766 · doi:10.1117/12.2056310

The ALMA assembly, integration, and verification project: a retrospective analysis

2014· article· en· W2010079766 on OpenAlexaff
B. López, L. B. G. Knee, Henriëtte I. Jager, N. Whyborn, J. P. McMullin, Richard Murowinski, A. B. Peck, Stuartt Corder

Bibliographic record

VenueProceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE · 2014
Typearticle
Languageen
FieldPhysics and Astronomy
TopicRadio Astronomy Observations and Technology
Canadian institutionsNational Research Council Canada
Fundersnot available
KeywordsMilestoneSubmillimeter ArrayProject commissioningComputer scienceDeliverableMillimeterSystems engineeringEngineeringPhysicsGeographyPublishingAstronomy

Abstract

fetched live from OpenAlex

The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Assembly, Integration, and Verification (AIV) of the antennas was completed at the end of the year 2013, while the final optimization and complete expansion to validate all planned observing modes will continue. This paper compares the actually obtained results of the period 2008-2013 with the baselines that had been laid out in the early project-planning phase (2005-2007). First plans made for ALMA AIV had already established a two-phased project life-cycle: phase 1 for setting up necessary infrastructure and common facilities, and taking the first three antennas to the start of commissioning; and phase 2 focused on the steady state processing of the remaining units. Throughout the execution of the project this lifecycle was refined and two additional phases were added, namely a transition phase between phases 1 and 2, and a closing phase to address the project ramp-down. A sub-project called Accelerated Commissioning and Science Verification (ACSV) was carried out during the year 2009 in order to provide focus to the whole ALMA organization, and to accomplish the start-of-commissioning milestone. Early phases of CSV focused on validating the basic performance and calibration. Over time additional observing modes have been validated as capabilities expanded both in hardware and software. This retrospective analysis describes the originally presented project staffing plans and schedules, the underlying assumptions, identified risks and operational models, among others. For comparison actual data on staffing levels, the resultant schedule, additional risks identified and those that actually materialized, are presented. The observed similarities and differences are then analyzed and explained, and corresponding lessons learned are presented.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Theoretical or conceptual · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.884
Threshold uncertainty score0.585

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0010.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.224
Teacher spread0.216 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designTheoretical or conceptual
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations2
Published2014
Admission routes1
Has abstractyes

Explore more

Same venueProceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIESame topicRadio Astronomy Observations and TechnologyFrench-language works237,207