The influence of a collaborative procurement approach using integrated design in construction on project team performance

2009· article· en· W2013080591 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.

Bibliographic record

VenueInternational Journal of Managing Projects in Business · 2009
Typearticle
Languageen
FieldDecision Sciences
TopicConstruction Project Management and Performance
Canadian institutionsÉcole de Technologie Supérieure
Fundersnot available
KeywordsProcurementKnowledge managementOriginalityContext (archaeology)Process managementBusinessComputer scienceQualitative researchMarketingSociology

Abstract

fetched live from OpenAlex

Purpose The purpose of the paper is to study the influence of procurement on the performance of integrated design teams. Design/methodology/approach The research paradigm is based on Russian socio‐constructivist approach to activity theory. Activity theory, as opposed to natural or social science, is a design science approach that focuses on the context aspect of project. A triangulation of qualitative research methods is used to investigate the dynamic of integrated teams in two different procurement contexts. Findings The paper is conclusive regarding the influence of procurement on team efficiency. It demonstrates that traditional procurement processes reinforce socio‐cognitive barriers that hinder team efficiency. It also illustrates how new procurement modes can transform the dynamic of relationships between the client and the members of the supply chain, and have a positive impact on team performance. Practical implications The paper demonstrates first that problems with integrated design team efficiency are related to context and not process – they are not technical but socio‐cognitive; second that fragmented transactional contracting increases socio‐cognitive barriers that hinder integrated design team performance; third that new forms of relational contracting may help to mitigate socio‐cognitive barriers and improve integrated design team performance, fourth that changing the context through procurement does not address the problem of obsolete design practices. Originality/value The paper brings together theories of production in lean construction and social learning as a rival approach to traditional project management theory for demonstrating the importance of context on team performance.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.005
metaresearch head score (Gemma)0.002
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.381
Threshold uncertainty score0.472

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0050.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.004
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0010.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.083
GPT teacher head0.364
Teacher spread0.281 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it