Record W2018199164 · doi:10.2118/79072-ms

The Long Lake Project – The First Field Integration of SAGD and Upgrading

2002· article· en· W2018199164 on OpenAlexaffabout
R. P. Kerr, John Birdgeneau, Bob Batt, Peter Yang, Gary Nieuwenburg, Phil Rettger, Jim Arnold, Yoram Bronicki

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldChemistry
TopicPetroleum Processing and Analysis
Canadian institutionsOptiwave Systems (Canada)
Fundersnot available
KeywordsSteam-assisted gravity drainageEnvironmental scienceAsphaltOil sandsSynthetic crudeCapital costWaste managementAsphaltenePetroleum engineeringProcess engineeringFossil fuelUnconventional oilEngineeringMaterials scienceChemical engineering

Abstract

fetched live from OpenAlex

Abstract The OPTI Canada Inc. (OPTI) / Nexen Inc. (Nexen) Long Lake integrated bitumen recovery and upgrading project is a unique solution to the three key problems associated with the development of thermally produced extra heavy oil resources: the low value of the produced oil, the high fuel cost associated with thermal production, and the need for diluents to transport the produced oil to markets. The Long Lake Project will produce a premium light sweet synthetic crude from steam assisted gravity drainage (SAGD) produced Athabasca bitumen, utilizing upgrader bottoms as the primary source for upgrader hydrogen and SAGD fuel. The core of the Long Lake integrated upgrader is the patented OrCrude™ upgrading process that uses distillation, solvent deasphalting, and thermal cracking in a unique combination to partially upgrade bitumen into OrCrude product and produce an asphaltene by-product. At the Long Lake Project the OrCrude process will be integrated with commercially proven technologies to hydrocrack the partially upgraded OrCrude product to premium synthetic crude. In addition, the asphaltenes will be fed to an asphaltene gasification system to produce hydrogen for the hydrocracker and syngas fuel for the SAGD process. The result is an integrated project that will produce premium synthetic crude with quality characteristics that are superior to other synthetics, at an operating cost that is less than any other Canadian production and upgrading project. The capital cost for the integrated Long Lake Project is forecasted to be comparable to other integrated Athabasca bitumen and upgrading projects. The OrCrude process has been demonstrated at a 500 bpsd commercial demonstration facility near Cold Lake, Alberta which has been operating since mid-2001 on Cold Lake and Athabasca bitumens. The Long Lake Project, currently in the regulatory review process, is proposed to have an initial size of 70,000 bpsd of SAGD production and 70,000 bpsd of upgrading. OPTI and Nexen have plans to subsequently expand the upgrader to 140,000 bpsd. Construction is planned to commence in late 2003 with production in 2006.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.765
Threshold uncertainty score0.466

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.001
Meta-epidemiology (narrow)0.0010.001
Meta-epidemiology (broad)0.0000.001
Bibliometrics0.0010.001
Science and technology studies0.0020.001
Scholarly communication0.0020.001
Open science0.0020.005
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0160.003

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.017
GPT teacher head0.241
Teacher spread0.224 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations12
Published2002
Admission routes2
Has abstractyes

Explore more

Same topicPetroleum Processing and AnalysisFrench-language works237,207