COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT, SINGLE‐ MACHINE PRODUCTION SYSTEM
Why this work is in the frame
A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.
Bibliographic record
Abstract
Traditionally, the problems of equipment maintenance scheduling and production scheduling in a multi‐product environment have been treated independently. In this paper, we develop a Markov decision process model that simultaneously determines maintenance and production schedules for a multiple‐product, single‐machine production system, accounting for the fact that equipment condition can affect the yield of different product types differently. The problem was motivated by an application in semiconductor manufacturing. After examining structural properties of the optimal policy, we compare the combined method to an approach often used in practice. In the nearly 6,000 test problems studied, the reward from the combined method was an average of more than 25 percent greater than the reward from the traditional method.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.000 | 0.000 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.000 | 0.000 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.000 | 0.001 |
| Open science | 0.000 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.000 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it