MétaCan
Menu
Back to cohort
Record W2026673887 · doi:10.1016/j.egypro.2013.06.680

Emergency Response Planning: An Example of International Collaboration in CCS Community Outreach and Project Development

2013· article· en· W2026673887 on OpenAlexaffabout
Norm Sacuta, Lori Gauvreau, Sallie Greenberg

Bibliographic record

VenueEnergy Procedia · 2013
Typearticle
Languageen
FieldEnvironmental Science
TopicAtmospheric and Environmental Gas Dynamics
Canadian institutionsPetroleum Technology Research Centre
FundersU.S. Department of Energy
KeywordsOutreachOpposition (politics)Community engagementPublic relationsPublic engagementPolitical scienceEngineeringPolitics

Abstract

fetched live from OpenAlex

When addressing community engagement and outreach, North American carbon capture and storage (CCS) projects have parameters unique to the continent, including the history of CO2 enhanced oil recovery (EOR), which goes back over 40 years in some jurisdictions and, aligned with this, the use of landmen and one-on-one dialogue with landowners and community residents that are well versed in oilfield technologies. These variables alone are in marked contrast to the CCS experiences of many global projects, which do not have the tradition of engaging in one-on-one discussion. Even where CCS projects have conducted extensive public consultation and education, significant opposition has shut down some, and put in jeopardy others, in a manner that contradicts the North American hydrocarbon experience. With the increase in North America of integrated CCS projects that go beyond CO2-EOR, a change in community engagement strategies has taken place under the unique auspices of the United States Department of Energy's (US DOE) Regional Carbon Sequestration Partnerships Initiative (RCSP). Part of the planning in each of these seven geographic regions includes significant public education, outreach, and communications programs, particularly in areas unfamiliar with injection and storage technologies (i.e., outside of traditional oil producing areas). The bringing together of different demonstration projects’ participants – not just nationally within the US but including projects in Western Canada – has allowed for the sharing of best practices between projects and across international jurisdictions. Such sharing is particularly true where the development of community engagement guidelines and strategies are concerned. The publication in 2010 of the US DOE's Best Practices for Public Outreach and Education for Carbon Storage Projects is one example where the experiences of several United States demonstration projects were brought to bear on developing communications guidelines, which in turn were used to help develop public outreach strategies for such projects as Aquistore in the province of Saskatchewan, Canada [1] . Another example of such international information sharing is the World Resources Institute's Guidelines for Community Engagement in Carbon Dioxide Capture, Transport, and Storage Projects where, over a period of a year and a half, international experts were brought together for round table discussions to form the basis of the guidelines and provide an international peer review [2] . More recently, the development of an emergency response plan for the Illinois Basin – Decatur Project, led by the Midwest Geological Sequestration Consortium, one of the RCSP partnerships, drew upon this international collaborative structure, employing the experience of communicators from Schlumberger Carbon Services, the Petroleum Technology Research Centre (managers of the IEAGHG Weyburn- Midale CO2 Monitoring and Storage Project) and the Illinois State Geological Survey to develop a map of potential crisis points. This planning process brought together the lessons learned from various projects, risk assessments, media experiences, and best practices to help identify potential risks for the project (a list of events and scenarios) with the goal of creating response paths and directions for the management of risks and the mitigation of potential threats. These scenarios involved not only potential external issues – such as leakage or pipeline failure – but also addressed management issues internal to a project such as loss of key personnel or loss of funding. The development of this emergency response plan is an example to other projects of the value of interconnecting communications experiences between projects, and of identifying common high-risk scenarios that require advanced response planning.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.021
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.022
GPT teacher head0.256
Teacher spread0.234 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations6
Published2013
Admission routes2
Has abstractyes

Explore more

Same venueEnergy ProcediaSame topicAtmospheric and Environmental Gas DynamicsFrench-language works237,207