MétaCan
Menu
Back to cohort
Record W2031005296 · doi:10.1063/1.4727881

Synchronization of high speed framing camera and intense electron-beam accelerator

2012· article· en· W2031005296 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

fundA Canadian funder is recorded on the work.
no affNo Canadian affiliation: this work is invisible to an affiliation-only frame.
No Canadian affiliation. An affiliation-only frame, the usual design, would never have seen this work. It is one of the works that make the case for inverting the frame.

Bibliographic record

VenueReview of Scientific Instruments · 2012
Typearticle
Languageen
FieldEngineering
TopicPulsed Power Technology Applications
Canadian institutionsnot available
FundersNational University of Defense TechnologyNational Natural Science Foundation of ChinaHeart and Stroke Foundation of CanadaNational Science Foundation
KeywordsSIGNAL (programming language)Avalanche photodiodeVoltageComputer scienceHigh voltageElectronic circuitElectrical engineeringPhysicsOpticsFraming (construction)Synchronization (alternating current)Signal processingTelecommunicationsDetectorComputer hardwareEngineeringDigital signal processing

Abstract

fetched live from OpenAlex

A new trigger program is proposed to realize the synchronization of high speed framing camera (HSFC) and intense electron-beam accelerator (IEBA). The trigger program which include light signal acquisition radiated from main switch of IEBA and signal processing circuit could provide a trigger signal with rise time of 17 ns and amplitude of about 5 V. First, the light signal was collected by an avalanche photodiode (APD) module, and the delay time between the output voltage of APD and load voltage of IEBA was tested, it was about 35 ns. Subsequently, the output voltage of APD was processed further by the signal processing circuit to obtain the trigger signal. At last, by combining the trigger program with an IEBA, the trigger program operated stably, and a delay time of 30 ns between the trigger signal of HSFC and output voltage of IEBA was obtained. Meanwhile, when surface flashover occurred at the high density polyethylene sample, the delay time between the trigger signal of HSFC and flashover current was up to 150 ns, which satisfied the need of synchronization of HSFC and IEBA. So the experiment results proved that the trigger program could compensate the time (called compensated time) of the trigger signal processing time and the inherent delay time of the HSFC.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: Bench or experimental
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.485
Threshold uncertainty score0.409

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.001
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.008
GPT teacher head0.240
Teacher spread0.232 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it