MétaCan
Menu
Back to cohort
Record W2031399725 · doi:10.1061/9780784412480.049

Southeast Collector Trunk Sewer Route Selection: The Regional Municipalities of York and Durham, Ontario, Canada

2012· article· en· W2031399725 on OpenAlexaffabout
M. Swan, W. Green, J. Whittard

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicUnderground infrastructure and sustainability
Canadian institutionsCanadian Sleep SocietyRegional Municipality of Durham
Fundersnot available
KeywordsEnvironmental scienceSanitary sewerDredgingCivil engineeringEnvironmental engineeringEngineeringGeology

Abstract

fetched live from OpenAlex

The York-Durham Sewage System (YDSS) is a large regional sewer system carrying approximately 80 percent of the wastewater flows from York Region as well as the communities of Ajax and Pickering in Durham Region. The Southeast Collector (SeC) trunk sewer is the primary outlet sewer to Duffin Creek Water Pollution Control Plant and as such is a critical component of the YDSS. The system will convey the wastewater flows from 1.5 million people by design year 2036. York and Durham Regions completed an Individual Environmental Assessment (IEA) in support of a major trunk sewer capacity upgrade of the SeC trunk sewer. The IEA was the first of its kind required by Ontario's Ministry of the Environment (MOE) for a major wastewater project. The IEA addressed key environmental and public concerns including groundwater impacts from construction/tunneling and public and agency opposition related to pipe construction. To address these concerns, baseline conditions were established and a three-stage methodology was implemented to identify and subsequently evaluate the alternative trunk sewer routes and alternative design methods (e.g., earth pressure balance tunnel technology versus open cut, use of sealed shaft construction, provision of dedicated haul roads and spoil sites, etc.). The IEA recommended the construction of a 15 kilometre, 3000-millimetre diameter sewer by tunnelling (using earth pressure balancing machine (EPBM) and sealed shaft construction). The project involves significant tunneling (five to 40+ metres below grade) under sensitive watercourses (cold water fishery) and associated tributaries and the protection of major groundwater aquifers serving local wells. The IEA document was approved by the MOE in August 2010 and the new sewer is currently under construction. This paper will focus on the political/regulation challenges the team faced and how approvals for this project were obtained. Specifically, a well-documented process was implemented to develop the alternative sewer routes, screen and select a shortlist of alternative routes and finally, select the preferred route. This process contributed to the various political and regulatory agencies approving this significant project.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesInsufficient payload (model declined to judge)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Observational · Consensus signal: Observational
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.163
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0010.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.009
GPT teacher head0.170
Teacher spread0.162 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designObservational
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2012
Admission routes2
Has abstractyes

Explore more

Same topicUnderground infrastructure and sustainabilityFrench-language works237,207