MétaCan
Menu
← Back to cohort
Record W2033853986 · doi:10.1115/ipc2014-33751

Environmental Management and Mitigation: Enbridge Northern Gateway Pipelines Project

2014· article· en· W2033853986 on OpenAlexaffabout
Paul F. Anderson, Jeffrey Green, Linda Postlewaite

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEnvironmental Science
TopicEnvironmental and Social Impact Assessments
Canadian institutionsStantec (Canada)
Fundersnot available
KeywordsGateway (web page)Pipeline transportGovernment (linguistics)Environmental planningEnvironmental impact assessmentPublic participationEnvironmental resource managementEngineeringEnvironmental scienceComputer scienceEnvironmental engineeringPolitical sciencePublic administrationLaw

Abstract

fetched live from OpenAlex

The Northern Gateway Pipelines project drew more attention from the Canadian public than most in recent Canadian history. Northern Gateway has proposed to construct and operate an oil pipeline, a condensate pipeline, associated facilities, two tunnels, powerlines, multiple pump stations, a land tank terminal, and a marine transportation terminal to be located near Kitimat, British Columbia. Not since the Canadian Pacific Railway has a project raised the interest of Canadians. The regulatory review and assessment process for Northern Gateway was extensive. The Canadian government established a Joint Review Panel to preside over the assessment and review process. To ensure that stakeholders and potentially affected aboriginal communities were heard, the Panel embarked on an extensive public hearing and consultation program. They received thousands of letters of interest, and 4,300 requests for public statements. The Panel heard from approximately 1,200 registered participants in 19 locations. The regulatory hearings spanned a period from September 2012 to June 2013. Opposition to the project stemmed primarily from concerns about the effect of oil spills on freshwater and marine environments and human use. Others were concerned about the expanded development of oil sands. The environmental assessment undertaken by Northern Gateway was extensive, as was the mitigation proposed by the project to avoid or minimize environmental effects resulting from the project. The project incorporated new and innovative approaches to minimize environmental effects. The paper introduces the project and the latter part discusses the extraordinary measures proposed and undertaken to minimize potential risks to the environment.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.003
metaresearch head score (Gemma)0.002
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: Not applicable
GenreCandidate signal: Other · Consensus signal: Other
Teacher disagreement score0.325
Threshold uncertainty score0.653

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0030.002
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0010.001
Science and technology studies0.0060.001
Scholarly communication0.0030.001
Open science0.0010.004
Research integrity0.0020.001
Insufficient payload (model declined to judge)0.0140.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.007
GPT teacher head0.228
Teacher spread0.221 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreOther

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes2
Has abstractyes

Explore more

Same topicEnvironmental and Social Impact Assessments→French-language works237,207→