An Analytical Framework for Incorporating Projects Supply Chain Problems into Project Plan
Bibliographic record
Abstract
The Supply Chain Management (SCM) field of research has developed a valuable set of concepts and strategies for integrating the core competencies of suppliers into the production systems, a trend followed by the construction industry. Research into quantifying the effects of upstream suppliers on the production rate of construction projects has been very limited. Literature for the construction industry generally discusses how SCM concepts can be adopted, or what problems and challenges inhibit such adoption without providing a framework to consider supply chain problems in early stage project planning. No analytical approach has yet been developed to help quantify the impact of upstream supply chain problems on the duration of construction projects. This paper presents an analytical framework for incorporating supply chain issues into project's plan and therefore assessing the impact of those issues on project's duration. A construction project case study is also presented for validation purposes.
Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.
How this classification was reachedexpand
Full frame distilled prediction
Teacher imitationNot calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.
Codex and Gemma teacher scores by category
| Category | Codex | Gemma |
|---|---|---|
| Metaresearch | 0.004 | 0.002 |
| Meta-epidemiology (narrow) | 0.000 | 0.000 |
| Meta-epidemiology (broad) | 0.000 | 0.000 |
| Bibliometrics | 0.001 | 0.001 |
| Science and technology studies | 0.000 | 0.000 |
| Scholarly communication | 0.001 | 0.001 |
| Open science | 0.001 | 0.000 |
| Research integrity | 0.000 | 0.000 |
| Insufficient payload (model declined to judge) | 0.001 | 0.000 |
Machine scores (provisional)
The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.
Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from itClassification
machine, unvalidatedMachine predicted; a candidate call from one teacher head, not a consensus.
How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".