MétaCan
Menu
Back to cohort
Record W2038652430 · doi:10.3808/jei.201200217

Production Scheduling and Waste Disposal Planning for Oil Sands Mining Using Goal Programming

2012· article· en· W2038652430 on OpenAlex

Why this work is in the frame

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

affAt least one author lists a Canadian institution in the pinned OpenAlex snapshot.
aboutThe title or abstract carries a Canadian signal from the geographic lexicon.

Bibliographic record

VenueJournal of Environmental Informatics · 2012
Typearticle
Languageen
FieldEngineering
TopicMining Techniques and Economics
Canadian institutionsCanadian Natural ResourcesUniversity of Alberta
Fundersnot available
KeywordsTailingsInteger programmingEngineeringProfitability indexNet present valueSustainabilityProduction scheduleLinear programmingWaste managementScheduling (production processes)Production (economics)Civil engineeringOperations managementComputer scienceBusiness

Abstract

fetched live from OpenAlex

In oil sands mining, timely provisions of ore and tailings containment with less environmental footprints are the main drivers of profitability and sustainability. The recent Alberta Energy Resources Conservation Board Directive 074 requires oil sands waste disposal planning to be an integral part of mine planning. This requires the development of a well integrated strategy of directional mining and tailings dyke construction for in-pit and ex-pit tailings storage management. The objectives of this paper are to: 1) determine the order and time of extraction of ore, dyke material and waste that maximizes the net present value; 2) determine the destination of dyke material that minimizes construction cost; and 3) minimize deviations from the production goals of the mining operation. We have developed, implemented, and verified a theoretical optimization framework based on mixed integer linear goal programming (MILGP) to address these objectives. This study presents an integration of mixed integer linear programming and goal programming in solving large scale mine planning optimization problems using clustering and pushback techniques. Application of the MILGP model was presented with an oil sands mining case. The MILGP model generated a smooth and uniform mining schedule that generates value and provides a robust framework for effective waste disposal planning. The results show that mining progresses with an ore to waste ratio of 1:1.5 throughout the mine life, generating an overall net present value of $14,237M. This approach improves the sustainable development of oil sands through better waste management.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: Simulation or modeling
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.363
Threshold uncertainty score0.439

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.019
GPT teacher head0.235
Teacher spread0.216 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it