MétaCan
Menu
Back to cohort
Record W2043195030 · doi:10.2118/153808-ms

Intervention Operations in a Gas Salt Dome Storage Well Using E-Line Conveyed Inflatable Packers

2012· article· en· W2043195030 on OpenAlexaboutno aff
Alejandro Osorio, Robert T. Brooks

Bibliographic record

Venuenot available
Typearticle
Languageen
FieldEngineering
TopicOil and Gas Production Techniques
Canadian institutionsnot available
Fundersnot available
KeywordsWellheadInflatableWorkoverSpark plugPetroleum engineeringEngineeringDrilling fluidNeutral buoyancyWell controlMarine engineeringEnvironmental scienceDrillingMechanical engineering

Abstract

fetched live from OpenAlex

Abstract A Natural Gas Liquid fractionation plant located in Ontario, Canada receives NGL feedstock from local industries in order to produce propane, iso-butane, and condensate. These finished products are stored in horizontal tanks and storage wells/salt caverns located within the chemical plant. One of these gas storage wells required two bridge plugs in order to create a barrier to enable workover operations to be undertaken. The objective was to load the well with brine in order to perform a logging run and replace the wellhead. There were two challenges involved in this operation: the lack of a workover rig and ‘wellbore fluid’ for setting an inflatable bridge plug. TAM International’s SlikPak™ Plus inflatable bridge plug setting system was the optimal solution because its ‘carry fluid’ configuration is capable of transporting the necessary inflation fluid to set a bridge plug without a workover rig on location. An additional challenge had to be overcome as well; both bridge plugs had to pass through a 7.6" (193.4 mm) ID wellhead restriction and inflate inside 13-3/8" (339.7 mm) casing. Therefore, during the first run, the inflatable bridge plug setting system had to carry twenty gallons (75.70 L) of inflation fluid within twelve 3-½" (88.9 mm) OD fluid chambers located along the toolstring in order to inflate and set the retrievable bridge plug. The client provided 105 feet (32 m) of lubricator and two cranes in order to perform a safe rig up of the 94 feet (28.65 m) long toolstring. The first bridge plug was successfully set at a depth of 2,040 feet (621.8 m) by stroking the mechanical Pull Intensifier. After the plug was set, the top section of the well was bled off and loaded with brine to enable the usage of the ‘wellbore fluid’ setting configuration, which successfully set the second bridge plug 31 feet (9.44 m) above the first one. After the wellhead changeout took place, both bridge plugs were successfully equalized, deflated, and retrieved in order to re-enable gas storage in this well. It is expected that there will be similar operations on a nearby well in the future.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.396
Threshold uncertainty score0.476

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.001
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.017
GPT teacher head0.264
Teacher spread0.246 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations1
Published2012
Admission routes1
Has abstractyes

Explore more

Same topicOil and Gas Production TechniquesFrench-language works237,207