MétaCan
Menu
Back to cohort
Record W2047932704 · doi:10.4043/25211-ms

Challenges of Lowering a Live Subsea Buried Gas Pipeline by 6m

2014· article· en· W2047932704 on OpenAlexaff
NI Thusyanthan, Kevin Williams, T. Selwood, Peter B. Smith, Sevaratnam Jegandan, Dilan Robert

Bibliographic record

VenueOffshore Technology Conference · 2014
Typearticle
Languageen
FieldEngineering
TopicOffshore Engineering and Technologies
Canadian institutionsIntecsea (Canada)
Fundersnot available
KeywordsSubseaPipeline transportPipeline (software)Submarine pipelineMarine engineeringPort (circuit theory)Channel (broadcasting)SeabedDredgingShorePetroleum engineeringEngineeringEnvironmental scienceTelecommunicationsGeologyEnvironmental engineeringElectrical engineeringMechanical engineeringOceanographyGeotechnical engineering

Abstract

fetched live from OpenAlex

Abstract There are hundreds of kilometers of subsea pipelines around the world, forming a network for the extraction and transportation of oil and gas products. When near shore subsea pipelines cross shipping channels to ports, these pipelines can limit the size of the ships that enter the port. This is because the shallow burial depth of the existing pipeline can prevent any additional dredging required to deepen the shipping channel to accommodate larger vessels. An attractive solution under such circumstances is lowering the pipeline section throughout the width of the channel so that the channel can be deepened. The option of shutting the line down or installing a re-routed new line has cost implications. However, the alternative of lowering a pipeline while it is fully operational has engineering risk, operational challenges and the offshore industry is not very experienced in such projects. This paper presents a case study of such a key project where a 16" gas pipeline was successfully lowered from -3 m to -9m below the seabed whilst fully operational. The live gas pipeline was crossing a shipping channel and was buried at 3m below seabed. In order for the port to expand and allow bigger vessels to enter the port, the shipping channel needed to be deepened. Thus the pipeline was required to be lowered a further 6m for a stretch of 350m where the pipeline crosses the shipping channel. The lowering operations had to be carried out whilst the pipeline was fully operational as it was a 70km pipeline with key supply. This paper presents detailed overview into engineering challenges and operational issues faced on the project. The paper discusses all the stages of the project, risk assessments; integrity assessment for pipeline lowering; geotechnical assessment of trench stability; detailed pipeline lowering stress assessment; pre-operational planning; pipeline survey and pipeline lowering operation; post lowering integrity assessment. The pipeline lowering was successfully completed to meet the project requirement after 14 lowering passes. This successful lowering of a live gas pipeline by 6m is considered to be world's first such lowering. Recommendations on how a pipeline lowering project should be approached, assessed and executed are presented in this paper.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesMeta-epidemiology (narrow)
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Bench or experimental · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.733
Threshold uncertainty score1.000

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0010.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0010.000
Research integrity0.0010.001
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.013
GPT teacher head0.206
Teacher spread0.194 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

Study designBench or experimental
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations0
Published2014
Admission routes1
Has abstractyes

Explore more

Same venueOffshore Technology ConferenceSame topicOffshore Engineering and TechnologiesFrench-language works237,207