MétaCan
← all works

Does Agile work? — A quantitative analysis of agile project success

2015· article· en· 810 citations· W2051526268 on OpenAlex· 10.1016/j.ijproman.2015.01.006

Why is this work in the frame?

A frame that forgets how it found something cannot be audited. These are the routes that admitted this work.

Canadian affiliationAn author listed a Canadian institution. This is the only route the usual frame has.

Machine scores (provisional)

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Opus teacher head0.162
GPT teacher head0.456
Teacher spread
0.294 · how far apart the two teachers sit on this one work
Validation status
score_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Abstract

No abstract. This is not a gap in this database — OpenAlex has none either. 23.3% of the frame is in this state, and the screen finds HALF as much metaresearch here, so the absence is a measured bias rather than a missing field.

The record

Venue
International Journal of Project Management
Topic
Construction Project Management and Performance
Field
Decision Sciences
Canadian institutions
Humber College
Funders
Keywords
Agile software developmentProcess managementProject managementStakeholderKnowledge managementQuality (philosophy)Project management triangleBusinessModerationEngineeringManagement scienceComputer scienceSystems engineeringPolitical sciencePublic relations
Has abstract in OpenAlex
no