MétaCan
Menu
Back to cohort
Record W2054353865 · doi:10.2118/130672-ms

The First Through-Tubing Capillary String Installation in the UK Sector of the North Sea

2010· article· en· W2054353865 on OpenAlexaff
Bruce Bremner, L. M. Murphy, Ralph Affinito, Alan Larnach, Dale Sanders, Michael J. Taggart, Michael J. Willis

Bibliographic record

VenueSPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition · 2010
Typearticle
Languageen
FieldEngineering
TopicDrilling and Well Engineering
Canadian institutionsNalco (Canada)
Fundersnot available
KeywordsCapillary actionSeparator (oil production)Gas liftCoiled tubingPetroleum engineeringWellboreMaterials scienceArtificial liftEnvironmental scienceMechanicsGeologyComposite material

Abstract

fetched live from OpenAlex

Abstract The Britannia field has been on production for approximately 10 years. Produced fluids are retrograde gas condensate with some associated water. In recent years, as the reservoir pressure has declined, some of the wells have entered a region where flow has become unstable due to the phenomenon of liquid loading. In a small number of cases the effects of liquid loading are so pronounced that the wells remain largely shut in and are not considered to be part of the “production pool”. In others a cyclic clean up program is employed which involves routing the wells periodically through the test separator at low pressure to unload the associated liquids. In 2007 a Low Rate Well Strategy was developed in order to identify possible solutions to address this issue of liquid loading. One such strategy was that of continuous foam injection at or just above the producing interval. This chemical application works by lowering the minimum liquid unloading rate of an individual well, thus enhancing the ability of that well to lift liquids from the wellbore. The method selected by Britannia to enable continuous injection of the chemical foamer was via a permanently installed thru- tubing capillary string. Capillary tubing is similar in appearance to coiled tubing. However it is much smaller in size, the outer diameters ranging from 1/4” to 5/8” and is more akin to the control line used to contain fluid for the operation of sub surface safety valves. The process by which a suitable chemical foamer for Britannia was selected and tested, both from an effectiveness and compatibility standpoint, will be discussed. The first operation to install a 3/8” capillary string on a Britannia well was successfully completed in May 2009. This was followed by a second installation in July 2009. The procedure included the installation of a modified tubing bonnet, which allows chemical injection at the wellhead, and deployment of a capillary tubing system which contains an integral sub surface safety valve. This system provides a flow path for produced fluids, and allows continuous injection of the chemical foamer from surface to the producing interval, whilst maintaining full well integrity. This paper will discuss the first installations of this system in the UK sector of the North Sea. The planning and design activities, followed by the offshore implementation, will be described in detail. Candidate selection and a review of well performance, both pre and post capillary string installation, will also be included. Whilst the “Wellhead Modification System” has been employed for the initial installations, simplified designs are being reviewed for future Britannia wells and these will also be discussed.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame distilled prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. Learned from the 10,348 direct Codex labels and 10,348 direct Gemma labels. Candidate is the union of thresholded teacher heads; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels or direct frontier model labels.

metaresearch head score (Codex)0.000
metaresearch head score (Gemma)0.000
Version: codex-gemma-dda1882f352aValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Simulation or modeling · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: Empirical
Teacher disagreement score0.563
Threshold uncertainty score0.411

Codex and Gemma teacher scores by category

CategoryCodexGemma
Metaresearch0.0000.000
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0000.000
Science and technology studies0.0000.000
Scholarly communication0.0000.000
Open science0.0000.000
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0000.000

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.011
GPT teacher head0.202
Teacher spread0.191 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one teacher head, not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designSimulation or modeling
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations4
Published2010
Admission routes1
Has abstractyes

Explore more

Same venueSPE/ICoTA Coiled Tubing and Well Intervention Conference and ExhibitionSame topicDrilling and Well EngineeringFrench-language works237,207