MétaCan
Menu
Back to cohort
Record W2056939082 · doi:10.1139/l05-126

Geographic information system based roadway construction planning

2006· article· en· W2056939082 on OpenAlexvenueno aff
Jongwon Seo, Sanghyeok Kang

Bibliographic record

VenueCanadian Journal of Civil Engineering · 2006
Typearticle
Languageen
FieldEngineering
TopicBIM and Construction Integration
Canadian institutionsnot available
Fundersnot available
KeywordsScheduling (production processes)Information systemComputer scienceGeographic information systemPlan (archaeology)EarthworksProcess (computing)Construction managementIntegrated business planningInformation integrationSystems engineeringTransport engineeringEngineeringDatabaseCivil engineeringOperations management

Abstract

fetched live from OpenAlex

The planning process for roadway construction involves a large amount of information on design, construction methods, quantities, unit costs, production rates, and site conditions. Therefore, it is very important to acquire, manage, and process the necessary information efficiently to produce a rigorous construction plan. The geographic information system (GIS) is a very effective tool for integrating and managing various types of information, including spatial and nonspatial data, required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its "interactive space scheduling" and "operation level planning" functions, which are supported by the integration of various data required for planning. The proposed system can assist construction planners in a unique way by integrating design and construction information and creating modularized design elements for space scheduling in real time using its interactive space scheduling function. In addition, operation level planning on earthwork can be conducted via the ability of the system to analyze haul routes in three dimensions and selecting the best equipment combination. It is expected that the proposed system could improve the efficiency of roadway construction planning.Key words: geographic information system (GIS), roadway construction planning, information integration, space scheduling.

Fetched live from OpenAlex and de-inverted. Abstracts are not stored in this database: the inverted indexes are 8.6 GB of the frame’s 9.3 GB of text, and the host has 13 GB free.

How this classification was reachedexpand

Full frame machine prediction

Teacher imitation

Not calibrated prevalence, not ground truth. Human validation pending. The Gemma side is a direct model label for every work in the frame, read from the title-only record. The Codex side is a classifier learned from the 10,348 direct Codex labels and calibrated to design-weighted sample rates; fields without enough sample support carry no Codex call. Candidate is the union of the two sides; consensus is their intersection. These outputs are machine_predicted_unvalidated and are not human labels.

metaresearch head score (Codex)0.001
metaresearch head score (Gemma)0.001
Version: metacan-v3-hybrid-931329e0061cValidation status: machine_predicted_unvalidated
Candidate categoriesnone
Consensus categoriesnone
DomainCandidate signal: none · Consensus signal: none
Study designCandidate signal: Not applicable · Consensus signal: none
GenreCandidate signal: Empirical · Consensus signal: none
Teacher disagreement score0.975
Threshold uncertainty score0.049

Distilled classifier scores by category (both heads)

CategoryCodexGemma
Metaresearch0.0010.001
Meta-epidemiology (narrow)0.0000.000
Meta-epidemiology (broad)0.0000.000
Bibliometrics0.0020.003
Science and technology studies0.0010.000
Scholarly communication0.0010.001
Open science0.0010.001
Research integrity0.0000.000
Insufficient payload (model declined to judge)0.0070.001

Machine scores (provisional)

The two teacher heads of the student model, read on this work. A score orders the frame for review; it never asserts a category, and the validation status ships verbatim with every row.

Baseline scores from an immature model (maturity gate not passed, 7 training rounds). Scores rank; they never assert a category.

Opus teacher head0.003
GPT teacher head0.140
Teacher spread0.137 · how far apart the two teachers sit on this one work
Validation statusscore_only:v0-immature-baseline · verbatim from the scoring run: score_only means the number may rank works, and no category label ships from it

Classification

machine, unvalidated

Machine predicted; a candidate call from one source (direct Gemma or distilled Codex), not a consensus.

The models applied no category: nothing in the taxonomy fit this work.
Study designNot applicable
Domainnot available
GenreEmpirical

How this classification was reached, model by model and score by score, is at the end of the page under "How this classification was reached".

Quick stats

Citations19
Published2006
Admission routes1
Has abstractyes

Explore more

Same venueCanadian Journal of Civil EngineeringSame topicBIM and Construction IntegrationFrench-language works237,207